FIR19-00086
| INSP-Final Inspection | 2/13/2019 | 2/13/2019 | 2/13/2019 2:31:54 PM | P | FAIL |
|
|
Need plan mods for deleting the ceiling mounted horn/strobe in the now Office and the device in the Restroom needs changed out to match the new devices so that the all function together
Please call 1/2 hour ahead of time Phone #: ###-#### Inspection requested via web by Rafe Barrett
|
FIR17-00508
| INSP-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 1:48:23 PM | P | FAIL |
|
|
As builds were missing some points and need updated,. network addressing from new building to main needs to be fixed in order to show what building the alarm is coming from. off site reporting does not work correctly. panel will send single alarm signal when panel is in trouble but will not restore or send other alarms till trouble is cleared. spoke with lee meridith and individual alarm/trouble/supervisory signals from panel to aes need to be set up qnd not single zone. elevator recall and remote mic still need to be tested. Area A TCO re-inspect Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
BLD18-03042
| FIRE-Final Inspection | 2/13/2019 | 2/13/2019 | 2/13/2019 12:35:54 PM | P | PASS |
|
|
life safety passed
Bob Phone #: ###-####
|
BLD18-02867
| FIRE-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 12:25:58 PM | A | FAIL |
|
|
Provide a fire exitinguisher as discussed with current inspection tag
Call for lock box combo // Rob Phone #: ###-####
|
BLD17-02262
| FIRE-Conference | 2/12/2019 | 2/13/2019 | 2/13/2019 12:03:42 PM | A | CANC |
|
|
Overall expectations project walk. Fire Extinguishers, Knox boxes, system setup, etc. Phone #: ###-#### Inspection requested via web by JT Turner
|
FIR19-00020
| INSP-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 10:56:02 AM | A | FAIL |
|
|
This permit/scope of work is not ready. Wrong permit was called in.
Call Leon Taylor for final inspection on Bodega TI Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
BLD18-01736
| FIRE-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 10:35:20 AM | A | PASS |
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by Mark Steen
|
FIR18-00512
| INSP-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 10:23:19 AM | A | PASS |
|
|
Underground supply line flush passed
|
BLD18-03208
| FIRE-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 9:31:29 AM | A | CANC |
|
|
I spoke to Tammy about racking permit requirements and that I could not find a fire sprinkler permit for the work done. Will be rescheduled.
Call for Tammy, she has the plans Phone #: ###-####
|
FIR18-00642
| FIR-Aging Inspection | 2/13/2019 | 2/13/2019 | 2/13/2019 9:04:32 AM | A | FAIL |
|
|
Not ready for final due to issues with hvac activation, need protecive cover for IP DACT, need cut sheet for FACP showing internal mounting for IP DACT, need fuel verification for generator, need to verify as-builts are correct (NAC's)
|
FIR19-00017
| INSP-Sprinkler Rough-in | 2/12/2019 | 2/13/2019 | 2/13/2019 9:01:54 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover.
Rick Phone #: ###-####
|
FIR18-00642
| INSP-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 8:55:12 AM | A | CANC |
|
|
As early as possible Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Wednesday, February 13, 2019.
|