Inspections for the day of: Thursday, February 15, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-04514 FIRE-Final Inspection2/15/20182/15/20182/15/2018 3:44:24 PMAFAIL
All corrections have been made except the door issue still needs resolved.

Phone #: ###-#### Inspection requested via web by Scott Simons
BLD17-02915 FIRE-Final Inspection2/15/20182/15/20182/15/2018 3:02:13 PMPCANC
Plans are still in review

Late afternoon - Bruce Phone #: ###-####
FIR17-00259 INSP-Final Inspection2/5/20182/15/20182/15/2018 2:45:22 PMPFAIL
For todays inspection we did a walk through for the placement of the notification devices. No actual testing was performed due to numerous corrections needed and no small documents available on site. I noted the manual pull stations are not mounted at the correct heights and one manual pull station has not been relocated yet as shown on the plans. Several strobes are overspaced and there are many locations where additional notification devices will be required. These locations include rooms marked as "offices" but are actually set up with functioning medical equipment. Also the floor plan/wall layout does not match in all locations. It appears plan modifications are required prior to the next inspection.

Rafe Phone #: ###-####
FIR17-00670 INSP-Sprinkler Rough-in/Hydro2/14/20182/15/20182/15/2018 2:31:25 PMPCANC
I'm unable to make it back for this hydro test. To be rescheduled for tomorrow


George Jess is the contact for this overhead hydro. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00098 INSP-Sprinkler Rough-in/Hydro2/14/20182/15/20182/15/2018 12:10:12 PMAPASS
Rough-in passed for the piping above the hardlids. Drops to the T-bar ceilings have not been cut/installed yet.

Kerry Phone #: ###-####
FIR18-00019 INSP-Sprinkler Rough-in2/15/20182/15/20182/15/2018 10:45:23 AMPPASS
Sprinkler rough-in passed. Need wall installed to verify coverage

ADAM Phone #: ###-####
FIR17-00632 INSP-Supply line flush2/14/20182/15/20182/15/2018 10:44:45 AMAPASS
The underground flush passed
FIR17-00632 INSP-Sprinkler Rough-in/Hydro2/14/20182/15/20182/15/2018 10:44:18 AMAPASS
The underground hydro test passed
BLD17-01702 FIRE-Final Inspection2/14/20182/15/20182/15/2018 9:56:31 AMAFAIL
Life safety will be ok to pass when the fire alarm modifications have been made at the flower shop and the bakery

Mike Phone #: ###-####
BLD17-02865 FIRE-Final Inspection2/15/20182/15/20182/15/2018 8:56:01 AMPPASS
Life safety passed

Andrew Phone #: ###-####
FIR18-00120 INSP-Final Inspection2/15/20182/15/20182/15/2018 8:55:39 AMPPASS

Permit finaled


Rick Phone #: ###-####
FIR17-00576 INSP-Sprinkler Rough-in2/14/20182/15/20182/15/2018 8:54:42 AMAPASS
The rough-in for the piping as marked on the plans is passed. Piping can not be covered yet until I have verification that the fire proofing has been repaired or does not need repaired as discussed.
FIR16-00821 INSP-Final Inspection2/14/20182/15/20182/15/2018 6:51:24 AMACANC
MIKE IS OUR FOREMAN FOR THE PROJECT. THIS IS IN CONJUNCTION WITH THE ALARM FINAL Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt