BLD17-04514
| FIRE-Final Inspection | 2/15/2018 | 2/15/2018 | 2/15/2018 3:44:24 PM | A | FAIL |
|
|
All corrections have been made except the door issue still needs resolved.
Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD17-02915
| FIRE-Final Inspection | 2/15/2018 | 2/15/2018 | 2/15/2018 3:02:13 PM | P | CANC |
|
|
Plans are still in review
Late afternoon - Bruce Phone #: ###-####
|
FIR17-00259
| INSP-Final Inspection | 2/5/2018 | 2/15/2018 | 2/15/2018 2:45:22 PM | P | FAIL |
|
|
For todays inspection we did a walk through for the placement of the notification devices. No actual testing was performed due to numerous corrections needed and no small documents available on site. I noted the manual pull stations are not mounted at the correct heights and one manual pull station has not been relocated yet as shown on the plans. Several strobes are overspaced and there are many locations where additional notification devices will be required. These locations include rooms marked as "offices" but are actually set up with functioning medical equipment. Also the floor plan/wall layout does not match in all locations. It appears plan modifications are required prior to the next inspection.
Rafe Phone #: ###-####
|
FIR17-00670
| INSP-Sprinkler Rough-in/Hydro | 2/14/2018 | 2/15/2018 | 2/15/2018 2:31:25 PM | P | CANC |
|
|
I'm unable to make it back for this hydro test. To be rescheduled for tomorrow
George Jess is the contact for this overhead hydro. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00098
| INSP-Sprinkler Rough-in/Hydro | 2/14/2018 | 2/15/2018 | 2/15/2018 12:10:12 PM | A | PASS |
|
|
Rough-in passed for the piping above the hardlids. Drops to the T-bar ceilings have not been cut/installed yet.
Kerry Phone #: ###-####
|
FIR18-00019
| INSP-Sprinkler Rough-in | 2/15/2018 | 2/15/2018 | 2/15/2018 10:45:23 AM | P | PASS |
|
|
Sprinkler rough-in passed. Need wall installed to verify coverage
ADAM Phone #: ###-####
|
FIR17-00632
| INSP-Supply line flush | 2/14/2018 | 2/15/2018 | 2/15/2018 10:44:45 AM | A | PASS |
|
|
The underground flush passed
|
FIR17-00632
| INSP-Sprinkler Rough-in/Hydro | 2/14/2018 | 2/15/2018 | 2/15/2018 10:44:18 AM | A | PASS |
|
|
The underground hydro test passed
|
BLD17-01702
| FIRE-Final Inspection | 2/14/2018 | 2/15/2018 | 2/15/2018 9:56:31 AM | A | FAIL |
|
|
Life safety will be ok to pass when the fire alarm modifications have been made at the flower shop and the bakery
Mike Phone #: ###-####
|
BLD17-02865
| FIRE-Final Inspection | 2/15/2018 | 2/15/2018 | 2/15/2018 8:56:01 AM | P | PASS |
|
|
Life safety passed
Andrew Phone #: ###-####
|
FIR18-00120
| INSP-Final Inspection | 2/15/2018 | 2/15/2018 | 2/15/2018 8:55:39 AM | P | PASS |
|
|
Permit finaled
Rick Phone #: ###-####
|
FIR17-00576
| INSP-Sprinkler Rough-in | 2/14/2018 | 2/15/2018 | 2/15/2018 8:54:42 AM | A | PASS |
|
|
The rough-in for the piping as marked on the plans is passed. Piping can not be covered yet until I have verification that the fire proofing has been repaired or does not need repaired as discussed.
|
FIR16-00821
| INSP-Final Inspection | 2/14/2018 | 2/15/2018 | 2/15/2018 6:51:24 AM | A | CANC |
|
|
MIKE IS OUR FOREMAN FOR THE PROJECT. THIS IS IN CONJUNCTION WITH THE ALARM FINAL Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt
|