BLD19-04223
| FIRE-Final Inspection | 2/19/2020 | 2/19/2020 | 2/19/2020 3:33:18 PM | P | FAIL |
|
|
Provide annual inspection tag for the fire extinguisher and repair the exit sign. jesse Phone #: ###-####
|
FIR19-00792
| INSP-Sprinkler Rough-in | 2/19/2020 | 2/19/2020 | 2/19/2020 2:31:31 PM | P | PART |
|
|
Piping rough-in passed. As-buillts are needed showing the supply pipe routing change for the 4th floor. Piping can not be covered until a tenting inspection has been passed. The stand pipe was not inspected due to a relocation request.
Tanner Phone #: ###-####
|
BLD19-03333
| FIRE-Conference | 2/18/2020 | 2/19/2020 | 2/19/2020 2:16:58 PM | A | DONE |
|
|
Conference was over the door hardware for the escape rooms. The hardware operation needs to meet Chapter 10 of the fire and building codes. It appears that sections 1010.1.9.8 and 1010.1.9.9 would be the applicable code sections. Also a fire alarm permit is required for the fire alarm interconnect required per the drawings and IFC section 1010.1.9.8. Also the project related fire sprinkler permit needs finaled.
Taylor Phone #: ###-####
|
BLD19-03209
| FIRE-Final Inspection | 2/18/2020 | 2/19/2020 | 2/19/2020 9:11:40 AM | A | PART |
|
|
Life safety for phase 1 and phase 2 is complete.
Tom Phone #: ###-####
|
FIR19-00827
| INSP-Sprinkler Rough-in | 2/18/2020 | 2/19/2020 | 2/19/2020 9:09:21 AM | A | PASS |
|
|
The phase 1 and phase 2 fire alarm installation is complete as marked on the plans. One hvac unit in phase 1 is still in need of repairs and verification that the duct smoke detector functions.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|