Inspections for the day of: Friday, February 21, 2020.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03898 FIRE-Final Inspection2/21/20202/21/20202/21/2020 2:14:39 PMPFAIL
Need the project related fire alarm permit finaled. Need the two exit signs modified as discussed. Need suite number posted. All other items appear ok. Phone #: ###-#### Inspection requested via web by Nate Carriveau
FIR19-00890 INSP-Final Inspection2/21/20202/21/20202/21/2020 2:13:00 PMPPASS
Permit finaled.

Richard Phone #: ###-####
FIR19-00883 INSP-Final Inspection2/21/20202/21/20202/21/2020 2:12:31 PMPFAIL
No testing performed. During walk through I fould many of the strobes overspaced and areas missing notificaiton. Contractor needs to perform a walk through and modify coverage to meet min. code. Plans need to be resubmitted showing the changes for approval before the next scheduled inspection.

Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR19-00353 INSP-Sprinkler Rough-in2/20/20202/21/20202/21/2020 10:48:06 AMAPASS
The revised location for the earth quake bracing at the Risers is ok. Piping above the hardlids in the 1st floor entry lobby is ok for cover.


Thank you Phone #: ###-#### Inspection requested via web by jeremiah robison
BLD19-02218 FIRE-Final Inspection2/20/20202/21/20202/21/2020 10:05:20 AMAPASS
Life safety passed.

Mike Phone #: ###-####
FIR18-00188 INSP-Final Inspection2/14/20202/21/20202/21/2020 9:03:42 AMAPASS
Permit finalede.

Peter will be onsite at 8:00 please Phone #: ###-#### Inspection requested via web by Fire Scheduler
FIR20-00052 INSP-Sprinkler Rough-in2/20/20202/21/20202/21/2020 9:02:01 AMAPASS
Rough-in passed. Piping can be covered. Plan review is ok with two pendants from a 1" outlet.Payton Nelson Phone #: ###-####
BLD19-04625 FIRE-Final Inspection2/20/20202/21/20202/21/2020 7:59:24 AMAPART
The life safety in the Gym area is complete. Fire alarm and fire sprinkler as well.

John Phone #: ###-####
FIR20-00019 INSP-Final Inspection2/19/20202/21/20202/21/2020 7:56:34 AMAPART
The fire alarm work in the Gym area is complete.

Contact is Dan. Requesting 7am inspection time. Troy has been contacted already concerning this. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR19-00958 INSP-Final Inspection2/20/20202/21/20202/21/2020 7:56:00 AMAPART
The sprinkler work in the Gym area is complete.

Phone #: ###-#### Inspection requested via web by Sam Ball