Inspections for the day of: Friday, February 26, 2016.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00022 INSP-Sprinkler Rough-in2/26/20162/26/20162/26/2016 1:55:27 PMPPASS
Rough-in passed. Piping can be covered. Need hydro test.
FIR16-00073 INSP-Sprinkler Rough-in2/26/20162/26/20162/26/2016 1:54:12 PMPPASS
Rough-in passed. Piping can be covered.
FIR16-00105 INSP-Sprinkler Rough-in2/26/20162/26/20162/26/2016 1:53:02 PMPPART
Piping can be covered up to the outlet provided by United Water. The remaining portion of piping has not been installed/inspected yet. Received letter from Shilo taking responcibility for underground which was partially installed by a United Water contractor.
FIR16-00104 INSP-Sprinkler Rough-in2/26/20162/26/20162/26/2016 1:49:11 PMPPART
The underground piping near the United Water connection has been lowered. Piping can be covered up to the new thrust blocks which have not been poured or inspected yet. That portion is scheduled for monday. Received letter from Shilo taking responcibility for underground which was partially installed by a United Water contractor.
BLD15-00243 FIRE-Final Inspection2/22/20162/26/20162/26/2016 12:18:04 PMAPASS
Life safety passed
BLD15-04260 FIRE-Final Inspection2/26/20162/26/20162/26/2016 11:33:44 AMAPASS
Life safety passed
FIR15-00715 INSP-Sprinkler Rough-in/Hydro2/25/20162/26/20162/26/2016 11:32:07 AMAFAIL
Overhead hydro failed due to visible loss at guage.
FIR15-00716 INSP-Sprinkler Rough-in/Hydro2/25/20162/26/20162/26/2016 11:31:10 AMAFAIL
Overhead hydro failed due to visible loss at guage.
FIR15-00717 INSP-Sprinkler Rough-in/Hydro2/25/20162/26/20162/26/2016 11:29:00 AMAFAIL
Overhead hydro failed due to visible loss at guage.
FIR15-00724 INSP-Final Inspection2/26/20162/26/20162/26/2016 9:54:11 AMAPART
Fire sprinkler work is complete on the south half of the building. The north half of the building needs the drops cut but has the existing upright protection remaining and spaced according to the new walls.
FIR15-00553 INSP-Final Inspection2/25/20162/26/20162/26/2016 9:10:21 AMAPASS
Permit finaled
FIR15-00664 INSP-Final Inspection2/25/20162/26/20162/26/2016 9:09:28 AMAPASS
Permit finaled
FIR16-00063 INSP-Final Inspection2/22/20162/26/20162/26/2016 9:08:50 AMAPASS
Permit finaled