BLD17-02915
| FIRE-Final Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 3:16:48 PM | P | CANC |
|
|
Hugo Phone #: ###-####
|
FIR17-00756
| INSP-Final Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 1:57:21 PM | P | FAIL |
|
|
Need correct suite number, all of the wall mounted strobes are too low, the 15cd ceiling mounted strobes can't be over 10' and the 95cd strobe in the Lobby is overspaced. No actual testing of devices happened. As-builts will need to be submitted to the plan reviewer prior to a final sign off.
Contact is Sean Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
BLD17-03877
| FIRE-Final Inspection | 2/5/2018 | 2/6/2018 | 2/6/2018 1:55:38 PM | A | FAIL |
|
|
Life safety will be ok to pass when the project related fire alarm permit is finaled.
Jim Phone #: ###-#### Inspection requested via web by Jim Wellman
|
FIR17-00462
| INSP-Sprinkler Rough-in | 2/6/2018 | 2/6/2018 | 2/6/2018 1:21:15 PM | P | PASS |
|
|
The underground supply line is ok for cover.
|
FIR17-00455
| INSP-Sprinkler Rough-in | 2/6/2018 | 2/6/2018 | 2/6/2018 1:21:00 PM | P | PASS |
|
|
The underground supply line is ok for cover.
|
FIR17-00441
| INSP-Sprinkler Rough-in | 2/6/2018 | 2/6/2018 | 2/6/2018 1:20:46 PM | P | PASS |
|
|
The underground supply line is ok for cover.
|
FIR17-00451
| INSP-Sprinkler Rough-in | 2/6/2018 | 2/6/2018 | 2/6/2018 1:20:27 PM | P | PASS |
|
|
The underground supply line is ok for cover.
|
BLD17-03529
| FIRE-Final Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 12:49:56 PM | P | FAIL |
|
|
Provide city approved plans/small documents, hang fire extinguisher, repair emergency light in back room, provide fire sprinkler permit for the relocation of the sprinkler pendants that are located too close to one another.
Devin Phone #: ###-####
|
FIR17-00741
| INSP-Final Inspection | 2/5/2018 | 2/6/2018 | 2/6/2018 11:32:33 AM | A | PASS |
|
|
Permit finaled
|
FIR17-00541
| INSP-Sprinkler Rough-in/Hydro | 2/5/2018 | 2/6/2018 | 2/6/2018 10:32:56 AM | A | PASS |
|
|
The second floor and pre-action system 200lb hydro tests passed.
|
FIR18-00078
| INSP-Final Inspection | 2/5/2018 | 2/6/2018 | 2/6/2018 8:29:42 AM | A | PASS |
|
|
permit finaled
Adam Phone #: ###-####
|
FIR18-00078
| INSP-Sprinkler Rough-in | 2/5/2018 | 2/6/2018 | 2/6/2018 8:29:16 AM | A | PASS |
|
|
Adam Phone #: ###-####
|