Inspections for the day of: Wednesday, February 6, 2019.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02372 FIRE-Final Inspection2/5/20192/6/20192/6/2019 1:41:20 PMAPASS
Life safety passed

Gary Phone #: ###-####
BLD17-02435 FIRE-Final Inspection1/30/20192/6/20192/6/2019 9:49:19 AMAFAIL
I left message on contacts voice mail that I was on the way. I went to project site but was only able to make contact with the tenant (troy). No inspection was performed.

Ann Phone #: ###-####
NAF18-00085 INSP-Sprinkler Rough-in2/5/20192/6/20192/6/2019 8:57:49 AMAPASS
The rough-in passed for the residence as marked/dated on the city approved plans. Piping can be covered on the first and second floors. Insulation to be installed above the piping on the third floor needs to be verified prior to a cover inspection for the third floor. this will be for Bldg A Lot 4

Tahnk YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
NAF18-00124 INSP-Sprinkler Rough-in2/5/20192/6/20192/6/2019 8:56:08 AMAPASS
The third floor residential rooms, as marked on the general contractors record drawing, are ok to cover except along the exterior walls as discussed. The dry sidewalls for the combustilbe concealed space over the balconies have been installed but the dry flex heads have not been installed yet.

Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
BLD17-02434 FIRE-Final Inspection1/30/20192/6/20192/6/2019 12:00:00 AMACANC
Ann Phone #: ###-####