BLD19-00681
| FIRE-Final Inspection | 3/8/2019 | 3/11/2019 | 3/11/2019 2:36:13 PM | P | FAIL |
|
|
Need the smoke evac system tested and the racks that exceed 8' in height addressed as per conversation.
Emily Phone #: ###-####
|
FIR19-00118
| INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 2:06:48 PM | P | PART |
|
|
The heads shown to be added/relocated are approved for cover. However I noted that a room in the scope of work (but no actual work being performed) has heads overspaced. This is based on two sets of building plans laying on site which show this room as a Storage Room. The existing pendant heads in this room exceed 130 sq. ft. per head for Ordinary Hazard. Also another pendant head within the building scope of work is 9'-0" off a wall in a light hazard space that exceeds the 800 sq. ft. max.
RICK Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
FIR18-00697
| INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 2:03:35 PM | P | FAIL |
|
|
There are issues with this permit number/job. Per activities this project was inspected on 9/7/18 after being scheduled by Shilo. The onsite underground installer and building contractor state that it hasn't been inspected yet. Per Pat with Biltmore Const. Shilo did not know about the project until January. I let all parties know they need to have the correct inspection/address/activity scheduled so that the proper inspection can be performed. Also concrete for the thrust blocks is running late. No inspection performed.
The contact is Bryan Collins. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00701
| INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 1:05:38 PM | P | PASS |
|
|
See the city approved plans for the hard lids marked "ok" where piping can be covered. and other areas dated and marked where the overhead rough-in is passed.
Mike Phone #: ###-####
|
NAF18-00085
| INSP-Sprinkler Rough-in | 3/8/2019 | 3/11/2019 | 3/11/2019 1:01:31 PM | P | PASS |
|
|
The additional pendant has been added in the third floor mechanical room. Piping can be covered. Head to be shown on as-builts prior to a final sign off.
Contact Andrew larson ###-#### 30 Min prior to RTC Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF18-00083
| INSP-Sprinkler Rough-in | 3/8/2019 | 3/11/2019 | 3/11/2019 1:01:07 PM | P | PASS |
|
|
The additional pendant has been added in the third floor mechanical room. Piping can be covered. Head to be shown on as-builts prior to a final sign off.
Contact Andrew Larson ###-#### 30 Min prior to RTC Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF18-00084
| INSP-Sprinkler Rough-in | 3/8/2019 | 3/11/2019 | 3/11/2019 12:18:30 PM | P | PASS |
|
|
The additional pendant has been added in the third floor mechanical room. Piping can be covered. Head to be shown on as-builts prior to a final sign off.
Contact Andrew Larson ###-#### 30 Min Prior to RTC Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
NAF18-00124
| INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 12:00:18 PM | P | PASS |
|
|
The last resident room on the third floor northwest corner of the building is ok for cover with the additional upright. The short north/south corridor on the west end of the building is also ok to cover with the addition of three new upright heads. These new heads will need to be shown on the as-builts.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
NAF19-00011
| INSP-Sprinkler Rough-in/Hydro | 3/8/2019 | 3/11/2019 | 3/11/2019 8:49:56 AM | A | PASS |
|
|
Rough-in passed for the Riser room and piping can be covered. Dry pendant has been relocated in the northwest canopy. Not ready for hydro until water is turned on.
|