BLD19-02464
| FIRE-Conference | 3/13/2020 | 3/13/2020 | 3/13/2020 3:22:18 PM | P | DONE |
|
|
Ed and I discussed the combustible concealed pockets.
Ed Phone #: ###-####
|
FIR19-00792
| INSP-Sprinkler Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 3:21:34 PM | P | FAIL |
|
|
Need the flexible cplgs installed and then hydro tested. WIll need the pressure guage moved back to the top when hydro is over. Tanner Phone #: ###-####
|
FIR19-00353
| INSP-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 3:18:35 PM | P | PASS |
|
|
permit finaled
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR19-00216
| INSP-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 3:17:41 PM | P | PASS |
|
|
permit finaled.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR19-00853
| INSP-Alarm Testing | 3/13/2020 | 3/13/2020 | 3/13/2020 2:42:52 PM | P | DONE |
|
|
Lee verified the head end equipment and the interconnection with the fire sprinkler devices. He noted that there may be sync issues. Candellas and smoke detectors need tested as well as elevator recall.
John Phone #: ###-####
|
BLD19-03898
| FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 1:52:58 PM | P | PASS |
|
|
Life safety passed.
Phone #: ###-#### Inspection requested via web by Nate Carriveau
|
FIR19-00883
| INSP-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 1:42:33 PM | P | PASS |
|
|
Permit finaled.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
BLD18-04290
| FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 12:58:03 PM | P | PASS |
|
|
Life safety passed.
Ian Phone #: ###-####
|
BLD18-04289
| FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 12:57:35 PM | P | PASS |
|
|
Life safety passed.
Ian Phone #: ###-####
|
BLD18-04286
| FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 12:57:07 PM | P | PASS |
|
|
Life safety passed.
Ian Phone #: ###-####
|
BLD18-04291
| FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 12:19:43 PM | P | PASS |
|
|
Life safety passed. Ian Phone #: ###-####
|
FIR19-00686
| INSP-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 11:37:24 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
BLD19-03333
| FIRE-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 10:21:32 AM | A | PASS |
|
|
Life safety passed. Taylor Phone #: ###-####
|
FIR19-00831
| INSP-Supply line flush | 3/11/2020 | 3/13/2020 | 3/13/2020 9:54:28 AM | A | PASS |
|
|
Supply line flush witnessed.
johnathon Phone #: ###-####
|
BLD19-01178
| FIRE-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 9:53:00 AM | A | FAIL |
|
|
Provide all smalll documents, remove dead bolt at Kitchen exit door, remove dead bolt at exit door near Rest Rooms and provide approved single action hardware, provide correct address, post occupant load sign, provide alarm system for the CO if required.
Wayne Phone #: ###-####
|
FIR19-00831
| INSP-Sprinkler Rough-in | 3/11/2020 | 3/13/2020 | 3/13/2020 9:11:20 AM | A | FAIL |
|
|
Insulators anr not done with installing the insulation at the roof deck. Will need to be rescheduled.
johnathon Phone #: ###-####
|
BLD19-03873
| FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 9:07:12 AM | A | FAIL |
|
|
Need the project related fire sprinkler permit passed. Need a fire alarm permit for required strobe modification, Need city approved plans and small documents.
Ed Phone #: ###-####
|
FIR20-00090
| INSP-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 9:05:54 AM | A | CANC |
|
|
Not ready for final. Need rough-in passed.
Please call James before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00090
| INSP-Sprinkler Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 9:04:31 AM | A | FAIL |
|
|
Installation appeared ok but there were no approved plans or small documents on site.
Please call James before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00077
| INSP-Sprinkler Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 8:32:04 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover. Cover Inspection. Jon O. Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
FIR20-00046
| INSP-Sprinkler Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 7:53:13 AM | A | PASS |
|
|
The pendant heads in the hard lids, as marked on the approved plans, are ok for cover.
Richard Clark Phone #: ###-#### Inspection requested via web by Stan Beus
|
NAF19-00111
| INSP-Final | 3/10/2020 | 3/13/2020 | 3/13/2020 12:00:00 AM | A | PART |
|
|
Kc Strykowski, Tech Phone #: ###-#### >> Inspection requested via web by John Siewert
Still to test: All smoke and heat detectors, all notification in ada units. Everything else has been tested.
|