Inspections for the day of: Friday, March 16, 2018.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00181 INSP-Final Inspection3/16/20183/16/20183/16/2018 3:33:55 PMPPASS
Permit finaled
BLD17-01277 FIRE-Conference3/16/20183/16/20183/16/2018 3:18:27 PMPDONE
The contractor and I discussed the wall in the "Drive Thru" that is shown to be demo'd. If this wall is to remain it appears that it may cause exiting issues from the Cashier area. There is a life safety plan that shows exit signs in the Cashier area that direct people to this Drive Thru. If people go into the Drive Thru this wall will block access to the exterior exit doors on the other side of the wall. At a minimum wall layout needs to match what is being built.
FIR17-00775 INSP-Sprinkler Rough-in3/16/20183/16/20183/16/2018 3:09:36 PMAPASS
See the as-builts for area, with todays date, where piping is ok for cover.
FIR18-00093 INSP-Sprinkler Rough-in3/16/20183/16/20183/16/2018 2:25:15 PMPCANC
Tom Phone #: ###-####
BLD14-03139 FIRE-Final Inspection3/15/20183/16/20183/16/2018 2:24:17 PMACANC
Induct detectors for the smoke dampers are not ready.

Edgy Phone #: ###-####
FIR17-00596 INSP-Sprinkler Rough-in3/15/20183/16/20183/16/2018 1:45:59 PMAPASS
Work complete in Passage 115
BLD06-02324 FIRE-Final Inspection3/16/20183/16/20183/16/2018 1:19:53 PMPPASS
life safety passed
FIR17-00447 INSP-Sprinkler Rough-in/Hydro3/16/20183/16/20183/16/2018 1:19:14 PMPFAIL
Overhead hydro failed. Loss of 5psi at the guage.
FIR17-00445 INSP-Sprinkler Rough-in/Hydro3/16/20183/16/20183/16/2018 1:17:42 PMPPASS
Overhead hydro test passed
FIR18-00129 INSP-Conference3/16/20183/16/20183/16/2018 1:01:16 PMPCANC
Contact Leroy Anderson ###-#### 30 Min prior to Consult start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD18-00243 FIRE-Final Inspection3/15/20183/16/20183/16/2018 12:57:29 PMAPASS
Life safety passed. Contractor is going to provide single action hardware on the new Humidor door and replace the sticker at the main/marked exit. The cooler blocking the fire extinguisher will be removed by tomorrow.

Call for access - John Phone #: ###-####
BLD18-00781 FIRE-Final Inspection3/15/20183/16/20183/16/2018 11:25:03 AMAPASS
life safety passed


Nicholas Phone #: ###-####
FIR17-00733 INSP-Final Inspection3/15/20183/16/20183/16/2018 11:08:08 AMAPART
The sync'ing of the notification has been repaired/tested and passed. All manual pull stations have been tested, the smoke detector above the main facp has been tested.


Zack Phone #: ###-####
BLD16-04077 FIRE-Final Inspection3/15/20183/16/20183/16/2018 10:10:39 AMAPASS
Life safety passed

Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD17-04441 FIRE-Final Inspection3/15/20183/16/20183/16/2018 8:49:43 AMAPASS
Life safety passed

Mike Phone #: ###-####
FIR18-00053 INSP-Final Inspection3/15/20183/16/20183/16/2018 8:12:31 AMAPASS
Permit finaled

Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR17-00574 INSP-Final Inspection3/15/20183/16/20183/16/2018 7:49:54 AMAPASS
Permit finaled
FIR17-00305 INSP-Final Inspection3/15/20183/16/20183/16/2018 7:40:52 AMAPASS
Permit finaled