Inspections for the day of: Monday, March 18, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02644 FIRE-Conference3/18/20193/18/20193/18/2019 3:17:42 PMPDONE
Jason and I spoke about fire sprinkler and fire alarm isuues that need addressed prior to a phase 1 approval.
FIR19-00120 INSP-Sprinkler Rough-in3/15/20193/18/20193/18/2019 3:14:31 PMPPASS
Rough-in passed. Piping can be covered. Gabe and I spoke about cpvc riser requirements.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-00943 FIRE-Conference3/17/20193/18/20193/18/2019 12:09:34 PMADONE
I went over general life safety items with Russell. There were no small documents on site. Phone #: ###-#### Inspection requested via web by Russell Valline
BLD18-03106 FIRE-Final Inspection3/18/20193/18/20193/18/2019 10:48:48 AMPPASS
Life safety passed
FIR18-00244 INSP-Final Inspection3/18/20193/18/20193/18/2019 10:28:18 AMPPASS
Permit finaled
FIR18-00244 INSP-Sprinkler Rough-in/Hydro3/18/20193/18/20193/18/2019 10:27:57 AMPCANC
Wrong inspection type scheduled.
FIR18-00675 INSP-Sprinkler Rough-in/Hydro3/15/20193/18/20193/18/2019 10:26:36 AMPCANC
Not ready for inspection yet after onsite visit with Robert during a conference with the General Contractor. Will need city approved drawings and we also discussed the need for a hydro test for the phase 1 area. Will be rescheduled for the morning. Robert Phone #: ###-####
FIR18-00560 INSP-Final Inspection3/14/20193/18/20193/18/2019 9:06:53 AMAPASS
Permit finaled

RICK FRY IS OUR CONTACT. Phone #: ###-#### Inspection requested via web by Brad Bettencourt