Inspections for the day of: Wednesday, March 18, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01178 FIRE-Final Inspection3/18/20203/18/20203/18/2020 4:45:26 PMPPASS
life safety passed.

Wayne Phone #: ###-####
FIR19-00853 INSP-Final Inspection3/17/20203/18/20203/18/2020 2:49:44 PMPFAIL
Testing today consisted of a walk through for business. See city approved plans for minor modifications needed for notification devices. Plan resubmittals are needed to show the changes. We also tested the smoke detectors and notification on the 4th floor. Need to test 3rd, 2nd, 1st floors and elevator.

Phone #: ###-#### Inspection requested via web by John Lopez
BLD20-00298 FIRE-Final Inspection3/18/20203/18/20203/18/2020 2:05:58 PMPFAIL
Provide code compliant voice evac system as per fire code review note #3, provide exit discharge ligths as per fire code review.

jake Phone #: ###-####
FIR20-00023 INSP-Sprinkler Rough-in3/17/20203/18/20203/18/2020 11:50:48 AMAPASS
Rough-in passed. Piping can be covered.

Phone #: ###-#### Inspection requested via web by Sam Ball
BLD19-03493 FIRE-Final Inspection3/17/20203/18/20203/18/2020 10:23:31 AMAFAIL
Need previous items corrected and new plans/mods on site.

Marcus Phone #: ###-####
FIR19-00319 INSP-Final Inspection3/17/20203/18/20203/18/2020 10:22:15 AMAFAIL
Plan mods are need showing the actual means of communication. I noted missing Knox Box and unlabled dedicated circuit and a heat detector has been provided for elevator recall on exterior elevator door. No items tested or inspected.

Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR18-00892 INSP-Final Inspection3/17/20203/18/20203/18/2020 9:17:38 AMAFAIL
No access due to sign on the door. Phone #: ###-#### Inspection requested via web by Connie Danes
FIR19-00792 INSP-Sprinkler Rough-in/Hydro3/17/20203/18/20203/18/2020 8:46:10 AMAPASS
Tenting passed. Piping can be covered except for the piping that crosses the breeze way. It will need separate inspection when the heat tape has been installed and inspected.

Tanner Phone #: ###-####
FIR20-00019 INSP-Final Inspection3/13/20203/18/20203/18/2020 8:45:08 AMAPASS
Permit finaled.

Contact is Dan. Client requests a 7:00AM final. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR19-00958 INSP-Final Inspection3/13/20203/18/20203/18/2020 8:44:48 AMAPASS
Permit finaled.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00629 INSP-Final Inspection3/16/20203/18/20203/17/2020 1:03:03 PMACANC
Cancel per Jim.

needs backflow forward flow test. Phone #: ###-#### Inspection requested via web by Connie Danes