Inspections for the day of: Friday, March 22, 2019.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00804 INSP-Sprinkler Rough-in/Hydro3/22/20193/22/20193/22/2019 3:09:11 PMPPASS
The 24 hour air test of wings A and B witnesses
BLD18-03849 FIRE-Final Inspection3/21/20193/22/20193/22/2019 2:37:07 PMPPASS
Life safety passed. Fire alarm is NA

Please contact Scott Hawker at ###-####. Phone #: ###-#### Inspection requested via web by Mattie Botero
BLD18-03942 FIRE-Final Inspection3/22/20193/22/20193/22/2019 2:06:43 PMPFAIL
Provide fire extinguisher as discussed. If exit signs are to remain then code compliant single action hardware wil be needed for both exit paths. If exit signs are removed then locks are ok for separation of tenant space. All interior hardware to be single action type as discussed. Keyed hardware at the main exit is ok with sticker. Lever hardware at main exit to be single action lever type.
BLD19-00570 FIRE-Final Inspection3/22/20193/22/20193/22/2019 2:02:51 PMPPART
Temp use permit. Temp for life safety as per scope of work. Address added and fire extinguishers tagged. Also exit added as per plan for west side rear corridor exit path.
BLD19-00570 FIRE-Final Inspection3/21/20193/22/20193/22/2019 1:41:42 PMAFAIL
No city approved plans on site. Need fire extinguishers tagged and address provided.

Laura Phone #: ###-####
FIR19-00080 INSP-Final Inspection3/21/20193/22/20193/22/2019 1:30:31 PMPPART
Phase 1 fire alarm complete. See comments by Lee for items needing correcting from the Phase 1 inspection prior to a final fire alarm permit sign off.

Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
BLD18-00943 FIRE-Final Inspection3/21/20193/22/20193/22/2019 1:27:33 PMAPART
Life safety passed for Phase 1.


Inspection requested via web by Russell Valline
NAF18-00124 INSP-Sprinkler Rough-in3/21/20193/22/20193/22/2019 12:30:12 PMAPASS
The first floor closet/room next to the east stairs is ok for cover.

Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
BLD18-03942 FIRE-Supply Line Hydro3/21/20193/22/20193/22/2019 12:29:27 PMACANC
Wrong inspection type scheduled. Will Phone #: ###-####
FIR19-00144 INSP-Final Inspection3/21/20193/22/20193/22/2019 12:28:58 PMAPASS
Permit finaled
FIR18-00675 INSP-Final Inspection3/21/20193/22/20193/22/2019 12:05:16 PMAPART
The Phase 1 work is complete. Forward flush testing passed. Robert Phone #: ###-####
BLD18-02552 FIRE-Final Inspection3/21/20193/22/20193/22/2019 12:02:24 PMAFAIL
Provide a tagged and mounted fire extinguisher as discussed and provide testing for the smoke evac system as discussed. Yad Phone #: ###-####
BLD18-00053 FIRE-Final Inspection3/21/20193/22/20193/22/2019 12:01:40 PMAPASS
Life safety passed. Cizel Phone #: ###-####
FIR18-00838 INSP-Final Inspection3/21/20193/22/20193/22/2019 11:07:45 AMAPASS
Permit finaled. Kenny Phone #: ###-####
BLD18-03849 FIRE-Alarm Testing3/21/20193/22/20193/21/2019 1:08:25 PMPCANC
Please call Scott Hawker ###-#### Phone #: ###-#### >> Inspection requested via web by Mattie Botero Inspection cancelled from web by: Mattie Botero