Inspections for the day of: Thursday, March 26, 2020.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03245 FIRE-Final Inspection3/26/20203/26/20203/26/2020 3:01:23 PMPFAIL
Repair east end exit discharge light, tidy up the wiring and install ceiling on both the 3rd and 4th floors, provide verification from the fire dept that the emergency radio coverage is acceptable, provide signage on the fire doors

josh Phone #: ###-####
FIR19-00831 INSP-Sprinkler Rough-in/Hydro3/26/20203/26/20203/26/2020 1:55:51 PMPPASS
The attic area sprinkler piping is ok for cover. Insulation backing needs repaired in one location but can be seen at the next inspection.

johnathon Phone #: ###-####
BLD19-01952 FIRE-Final Inspection3/26/20203/26/20203/26/2020 1:46:18 PMPPASS
Life safety passed.

Phone #: ###-#### Inspection requested via web by Dan Ryan
BLD19-01123 FIRE-Final Inspection3/25/20203/26/20203/26/2020 1:44:38 PMAPASS
Life safety passed. Call for access/site meeting. Phone #: ###-#### Inspection requested via web by Stephen Griswold
FIR19-00319 INSP-Final Inspection3/24/20203/26/20203/26/2020 11:49:12 AMPFAIL
We finisher the inspection on elevator #2 but found that the power/control monitoring was not working and the sprinkler tamper switches are being reported as elevator smoke supervisory. All signals need to be reverified and the power monitoring repaired/tested.

Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR19-00770 INSP-Final Inspection3/25/20203/26/20203/26/2020 11:17:25 AMAPASS
Permit finaled. Water meter changed per Suez. See the email attached in Documents for Boise Fire agreement on revised water flow.

Cam Phone #: ###-####
BLD19-03316 FIRE-Final Inspection3/25/20203/26/20203/26/2020 9:49:29 AMAPASS
Life safety passed.

Building numbers are installed, extinguishers mounted, and gate hardware exchanged. Review docs are on site with approved plans. Phone #: ###-#### Inspection requested via web by Ian Franklin
FIR19-00853 INSP-Final Inspection3/23/20203/26/20203/26/2020 8:55:25 AMAPASS
Permit finaled. Phone #: ###-#### Inspection requested via web by John Lopez