NAF18-00124
| INSP-Sprinkler Rough-in/Hydro | 4/1/2019 | 4/1/2019 | 4/1/2019 2:18:53 PM | P | PASS |
|
|
The piping above the hardlids, on the second floor, from column line 6 to 11 is ok for cover. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
FIR18-00901
| INSP-Sprinkler Rough-in/Hydro | 4/1/2019 | 4/1/2019 | 4/1/2019 2:15:54 PM | P | FAIL |
|
|
The underground supply piping was not pressurized when I arrived at job site. Per Tom a letter from Suez will be provided since the underground piping will not hold pressure. underground // Tom Phone #: ###-####
|
FIR19-00118
| INSP-Final Inspection | 3/29/2019 | 4/1/2019 | 4/1/2019 2:13:29 PM | P | FAIL |
|
|
Need the Storage Room 103 pendant heads addressed prior to a final sign off.
Adam Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
NAF19-00015
| INSP-Final | 3/27/2019 | 4/1/2019 | 4/1/2019 1:34:52 PM | P | FAIL |
|
|
Not ready for a final. Rough-in passed. Piping can be covered.
Call prior to going Phone #: 2085658146 >> Inspection equested via mobile web by James Baker
|
BLD18-03876
| FIRE-Final Inspection | 3/28/2019 | 4/1/2019 | 4/1/2019 10:07:12 AM | A | FAIL |
|
|
Replace the painted sprinkler heads, provide sticker at main exit, provide racking permit for the storage racks over 8'-0"
after nine // Spencer Phone #: ###-####
|
BLD19-00866
| FIRE-Final Inspection | 3/26/2019 | 4/1/2019 | 4/1/2019 8:32:06 AM | A | FAIL |
|
|
Repair all exit signs and emergencyu lights. All other items appear ok.
Call ahead 20 minutes // Katie Phone #: ###-####
|
FIR19-00138
| INSP-Sprinkler Rough-in | 3/29/2019 | 4/1/2019 | 4/1/2019 8:01:48 AM | A | FAIL |
|
|
Tenting needs to be extended further beyond pendant head drops and I noted one hanger not mount to the structure.
Gabe Garduno is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|