FIR18-00282
| INSP-Sprinkler Rough-in | 4/12/2019 | 4/15/2019 | 4/16/2019 6:41:55 AM | P | CANC |
|
|
rick Phone #: ###-####
|
FIR19-00221
| INSP-Sprinkler Rough-in | 4/15/2019 | 4/15/2019 | 4/15/2019 2:02:35 PM | P | FAIL |
|
|
Plan mods are needed for the pipe routing changes and additional fittings. No cover given. Tom Phone #: ###-####
|
BLD17-04134
| FIRE-Final Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 1:49:49 PM | P | PASS |
|
|
Life safety passed. Contractor to provide single action hardware on the Office door, door that isolates Storage area and the exterior exit door from the Storage area prior to a building inspection as per discussion.
after 130....please call 20 mins before // jake Phone #: ###-####
|
BLD19-00461
| FIRE-Final Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 1:22:22 PM | P | PASS |
|
|
Life safety passed
|
NAF17-00077
| INSP-Final | 4/15/2019 | 4/15/2019 | 4/15/2019 11:33:28 AM | P | DONE |
|
|
Life safety passed. Signage has been added at the property entrances.
Call prior to going Phone #: 2086972714 >> Inspection requested via mobile web by Brad
|
FIR18-00670
| INSP-Final Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 11:31:42 AM | P | CANC |
|
|
Not ready for final. See morning comments. A re-inspection fee has been added due to the overhead hydro test failing twice before.
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR18-00654
| INSP-Final Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 11:29:19 AM | P | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR18-00670
| INSP-Sprinkler Rough-in/Hydro | 4/12/2019 | 4/15/2019 | 4/15/2019 10:18:11 AM | A | FAIL |
|
|
Overhead hydro test failed due to visible loss at the guage, need as-builts per earlier correction note for flex heads and additional earthquake bracing. All device interconnect with the new fire alarm panel passed.
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR18-00654
| INSP-Sprinkler Rough-in/Hydro | 4/12/2019 | 4/15/2019 | 4/15/2019 10:16:55 AM | A | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR18-00853
| INSP-Final Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 10:16:23 AM | A | FAIL |
|
|
Need as-builts and calculations as per the review comments.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR18-00282
| INSP-Sprinkler Rough-in | 4/12/2019 | 4/15/2019 | 4/15/2019 8:19:55 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered in the Kitchen area.
Please call Roy with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|