BLD17-01549
| FIRE-Conference | 4/23/2019 | 4/23/2019 | 4/23/2019 2:47:06 PM | P | DONE |
|
|
Renee and I discussed the location for the building address and agreed for it to be placed on the east side of the hose tower.
|
FIR19-00244
| INSP-Final Inspection | 4/22/2019 | 4/23/2019 | 4/23/2019 2:00:19 PM | P | PASS |
|
|
permit finaled
Phone #: ###-#### Inspection requested via web by David Ozmer
|
BLD19-00515
| FIRE-Final Inspection | 4/23/2019 | 4/23/2019 | 4/23/2019 1:19:58 PM | P | PART |
|
|
The life safety for the Restrooms is passed. I noted that sprinkler modifications will be required in the area the Factory expanded into. The sprinkler pendants were installed for light hazard but now need to meet ordinary hazard.
Please call 30 mins a head of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
FIR18-00918
| INSP-Sprinkler Rough-in/Hydro | 4/22/2019 | 4/23/2019 | 4/23/2019 1:15:49 PM | P | PART |
|
|
The general rough-in is ok except the Coin upright heads over the restrooms are installed too low as per the data sheet. Will need to restart the hydro due to the need to modify the pipe and heads.
POC is Raul Munoz Phone #: ###-#### Inspection requested via web by Chris Green
|
BLD19-00849
| FIRE-Final Inspection | 4/22/2019 | 4/23/2019 | 4/23/2019 12:09:05 PM | P | PASS |
|
|
Switch the suite numbers for 150 and 175 as shown on plans and provide single action hardware on the restroom doors as discussed prior to a building inspection.
please give 30 mins prior- Tom Phone #: ###-####
|
FIR19-00156
| INSP-Sprinkler Rough-in/Hydro | 4/22/2019 | 4/23/2019 | 4/23/2019 10:17:06 AM | A | PASS |
|
|
The overhead hydro was witnessed with no pressure loss.
Contact Tyler Loomis ###-#### 30 min prior to Hydro Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
BLD19-00776
| FIRE-Final Inspection | 4/22/2019 | 4/23/2019 | 4/23/2019 8:46:10 AM | A | FAIL |
|
|
Life safety will be ok to pass after a fire alarm permit is pulled and finaled for the required modifications.
Able Phone #: ###-####
|
FIR17-00603
| INSP-Final Inspection | 4/22/2019 | 4/23/2019 | 4/23/2019 8:39:45 AM | A | PART |
|
|
Sprinkler work is complete for the five pendant heads in the north corridor.
Todd Ketterling is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-03430
| FIRE-Final Inspection | 4/22/2019 | 4/23/2019 | 4/23/2019 8:38:13 AM | A | PASS |
|
|
life safety passed.
Aaron Phone #: ###-####
|