Inspections for the day of: Monday, April 29, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00640 INSP-Conference4/26/20194/29/20194/30/2019 10:43:52 AMPDONE
Jon and I discussed the requirements for heat tor the wet pipe system above the ceilings in the aoffice area. After a discussion with the fire dept I let Jon know the if direct heat is not provided or insulation provided that heat transfer calculations will be required from a registered engineer.

Jon Beazer is requesting a consult for this project. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-04402 FIRE-Final Inspection4/26/20194/29/20194/29/2019 3:55:02 PMAFAIL
Install exit signs per approved plans or get plan review approval to relocate or remove.

Mike Phone #: ###-####
FIR19-00221 INSP-Sprinkler Rough-in4/29/20194/29/20194/29/2019 2:50:57 PMPPASS
See the updated city approved plans for locations marked where piping is ok for cover on the first floor. Third floor was only a rough-in since not tenting has been done. The areas included the Suites on the first floor north half of the building and the Suites/Corridor/Lobby of the north half of the third floor.
FIR19-00026 INSP-Final Inspection4/29/20194/29/20194/29/2019 1:20:39 PMPPASS
Permit finaled

Lony Phone #: ###-####
FIR19-00026 INSP-Sprinkler Rough-in4/29/20194/29/20194/29/2019 12:40:35 PMPPASS
Rough-in passed.


Lony Phone #: ###-####
FIR18-00673 INSP-Final Inspection4/29/20194/29/20194/29/2019 12:18:19 PMPCANC
The project related fire alarm permit is still in Ready To Issue status. No inspection was performed. Will need to reschedule when ready. Please call ahead Phone #: ###-#### Inspection requested via web by Gary Gambino
BLD18-01593 FIRE-Final Inspection4/26/20194/29/20194/29/2019 11:50:28 AMAFAIL
Need the fire alarm permit finaled. Kevin Phone #: ###-####
BLD18-00803 FIRE-Final Inspection4/26/20194/29/20194/29/2019 11:49:46 AMAFAIL
Need plans and small documents and the sprinkler permit finaled. Kevin Phone #: ###-####
BLD18-01892 FIRE-Final Inspection4/26/20194/29/20194/29/2019 11:48:56 AMAFAIL
Need plans and small documents

Kevin Phone #: ###-####
FIR18-00435 INSP-Sprinkler Rough-in4/29/20194/29/20194/29/2019 11:31:53 AMPPASS
See the city approved plans for locations where sprinkler piping can be covered. Noted several areas with deficiencies that will need to be addressed such as blocked heads and missing heads.

Jon Beazer is the contact. This is to be a partial rough-in. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00918 INSP-Final Inspection4/26/20194/29/20194/29/2019 10:13:18 AMAFAIL
Permit will be ok to final when a FIR permit is issued/tested for the control valve tamper switch below the mezzanine.

Raul is the contact. Phone #: ###-#### Inspection requested via web by Chris Green
FIR18-00675 INSP-Sprinkler Rough-in/Hydro4/25/20194/29/20194/29/2019 9:51:59 AMAPASS
Overhead hydro test for the south half of the project passed with no visible loss at the guage. Also corrections have been made as previously noted so all piping can be covered.

Contact is Jeff Phone #: ###-#### Inspection requested via web by Chris Green
BLD19-00277 FIRE-Final Inspection4/26/20194/29/20194/29/2019 9:23:37 AMAFAIL
The label needs to be permanantly attached as per the IFC.

Kevin Phone #: ###-####
FIR19-00126 INSP-Sprinkler Rough-in4/29/20194/29/20194/29/2019 12:00:00 AMPDONE
OK to cover hard ceilings only. Pipe chase needs to stay open. Need to add heads for 24" spiral duct. Area above ceiling in back stairwell needs to stay open till heads are installed. *MAS* Contact Ken Orahood - ###-#### 30 Min Prior to RTC insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank
FIR19-00299 INSP-Sprinkler Rough-in4/29/20194/29/20194/29/2019 12:00:00 AMPFAIL
Unable to gain access due to floors being prepped for refinishing. Nick is the contact Phone #: ###-#### >> Inspection requested via web by Chris Green
FIR19-00299 INSP-Final Inspection4/29/20194/29/20194/29/2019 12:00:00 AMPDONE
Unable to gain access due to floors being prepped for refinishing. Nick is the contact Phone #: ###-#### >> Inspection requested via web by Chris Green