FIR18-00640
| INSP-Conference | 4/26/2019 | 4/29/2019 | 4/30/2019 10:43:52 AM | P | DONE |
|
|
Jon and I discussed the requirements for heat tor the wet pipe system above the ceilings in the aoffice area. After a discussion with the fire dept I let Jon know the if direct heat is not provided or insulation provided that heat transfer calculations will be required from a registered engineer.
Jon Beazer is requesting a consult for this project. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-04402
| FIRE-Final Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 3:55:02 PM | A | FAIL |
|
|
Install exit signs per approved plans or get plan review approval to relocate or remove.
Mike Phone #: ###-####
|
FIR19-00221
| INSP-Sprinkler Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 2:50:57 PM | P | PASS |
|
|
See the updated city approved plans for locations marked where piping is ok for cover on the first floor. Third floor was only a rough-in since not tenting has been done. The areas included the Suites on the first floor north half of the building and the Suites/Corridor/Lobby of the north half of the third floor.
|
FIR19-00026
| INSP-Final Inspection | 4/29/2019 | 4/29/2019 | 4/29/2019 1:20:39 PM | P | PASS |
|
|
Permit finaled
Lony Phone #: ###-####
|
FIR19-00026
| INSP-Sprinkler Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 12:40:35 PM | P | PASS |
|
|
Rough-in passed.
Lony Phone #: ###-####
|
FIR18-00673
| INSP-Final Inspection | 4/29/2019 | 4/29/2019 | 4/29/2019 12:18:19 PM | P | CANC |
|
|
The project related fire alarm permit is still in Ready To Issue status. No inspection was performed. Will need to reschedule when ready. Please call ahead Phone #: ###-#### Inspection requested via web by Gary Gambino
|
BLD18-01593
| FIRE-Final Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 11:50:28 AM | A | FAIL |
|
|
Need the fire alarm permit finaled. Kevin Phone #: ###-####
|
BLD18-00803
| FIRE-Final Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 11:49:46 AM | A | FAIL |
|
|
Need plans and small documents and the sprinkler permit finaled. Kevin Phone #: ###-####
|
BLD18-01892
| FIRE-Final Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 11:48:56 AM | A | FAIL |
|
|
Need plans and small documents
Kevin Phone #: ###-####
|
FIR18-00435
| INSP-Sprinkler Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 11:31:53 AM | P | PASS |
|
|
See the city approved plans for locations where sprinkler piping can be covered. Noted several areas with deficiencies that will need to be addressed such as blocked heads and missing heads.
Jon Beazer is the contact. This is to be a partial rough-in. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00918
| INSP-Final Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 10:13:18 AM | A | FAIL |
|
|
Permit will be ok to final when a FIR permit is issued/tested for the control valve tamper switch below the mezzanine.
Raul is the contact. Phone #: ###-#### Inspection requested via web by Chris Green
|
FIR18-00675
| INSP-Sprinkler Rough-in/Hydro | 4/25/2019 | 4/29/2019 | 4/29/2019 9:51:59 AM | A | PASS |
|
|
Overhead hydro test for the south half of the project passed with no visible loss at the guage. Also corrections have been made as previously noted so all piping can be covered.
Contact is Jeff Phone #: ###-#### Inspection requested via web by Chris Green
|
BLD19-00277
| FIRE-Final Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 9:23:37 AM | A | FAIL |
|
|
The label needs to be permanantly attached as per the IFC.
Kevin Phone #: ###-####
|
FIR19-00126
| INSP-Sprinkler Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 12:00:00 AM | P | DONE |
|
|
OK to cover hard ceilings only. Pipe chase needs to stay open. Need to add heads for 24" spiral duct. Area above ceiling in back stairwell needs to stay open till heads are installed. *MAS* Contact Ken Orahood - ###-#### 30 Min Prior to RTC insp start please
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank
|
FIR19-00299
| INSP-Sprinkler Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 12:00:00 AM | P | FAIL |
|
|
Unable to gain access due to floors being prepped for refinishing. Nick is the contact Phone #: ###-#### >> Inspection requested via web by Chris Green
|
FIR19-00299
| INSP-Final Inspection | 4/29/2019 | 4/29/2019 | 4/29/2019 12:00:00 AM | P | DONE |
|
|
Unable to gain access due to floors being prepped for refinishing. Nick is the contact Phone #: ###-#### >> Inspection requested via web by Chris Green
|