Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00478 FIRE-Final Inspection4/3/20194/3/20194/3/2019 12:34:09 PMPPASS
Life safety passed

Will Phone #: ###-####
FIR19-00138 INSP-Sprinkler Rough-in4/2/20194/3/20194/3/2019 12:17:37 PMACANC
There is a "Fees Due Hold" on this permit. Fees need to be paid prior to an inspection. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
NAF18-00124 INSP-Sprinkler Rough-in4/2/20194/3/20194/3/2019 12:04:03 PMAPASS
Dry system rough-in passed. Need seismic restraints at the ends of the branchlines as discussed. Sheet rock is ok to be installed above the piping for the rated envelope.

Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
NAF18-00124 INSP-Sprinkler Rough-in/Hydro4/2/20194/3/20194/3/2019 12:02:46 PMAFAIL
24 hour air test failed due to visible leak at the dry pipe valve.

Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
NAF18-00089 INSP-Sprinkler Rough-in/Hydro4/2/20194/3/20194/3/2019 10:45:45 AMAFAIL
Underground supply line hydro test failed due to excessive pressure loss.

Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00740 INSP-Final Inspection4/2/20194/3/20194/3/2019 8:53:27 AMAPASS
Permit finaled. Previous correction notes have been addressed and plan mods received.