BLD19-00478
| FIRE-Final Inspection | 4/3/2019 | 4/3/2019 | 4/3/2019 12:34:09 PM | P | PASS |
|
|
Life safety passed
Will Phone #: ###-####
|
FIR19-00138
| INSP-Sprinkler Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 12:17:37 PM | A | CANC |
|
|
There is a "Fees Due Hold" on this permit. Fees need to be paid prior to an inspection. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
NAF18-00124
| INSP-Sprinkler Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 12:04:03 PM | A | PASS |
|
|
Dry system rough-in passed. Need seismic restraints at the ends of the branchlines as discussed. Sheet rock is ok to be installed above the piping for the rated envelope.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
NAF18-00124
| INSP-Sprinkler Rough-in/Hydro | 4/2/2019 | 4/3/2019 | 4/3/2019 12:02:46 PM | A | FAIL |
|
|
24 hour air test failed due to visible leak at the dry pipe valve.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
NAF18-00089
| INSP-Sprinkler Rough-in/Hydro | 4/2/2019 | 4/3/2019 | 4/3/2019 10:45:45 AM | A | FAIL |
|
|
Underground supply line hydro test failed due to excessive pressure loss.
Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00740
| INSP-Final Inspection | 4/2/2019 | 4/3/2019 | 4/3/2019 8:53:27 AM | A | PASS |
|
|
Permit finaled. Previous correction notes have been addressed and plan mods received.
As early as possible Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|