Inspections for the day of: Monday, May 13, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00789 INSP-Supply line flush5/13/20195/13/20195/13/2019 3:31:27 PMPPASS
Underground flush witnessed. Phone #: ###-#### Inspection requested via web by Sam Ball
NAF18-00124 INSP-Conference5/13/20195/13/20195/13/2019 2:47:24 PMPDONE
I performed a walk through of the Resident Areas of the first floor and it looks like sprinkler work is complete except for the waterheater closet in the corridor which has no ceiling. I did not look in the Riser Room. I performed the same walk through of the second floor for the Resident Rooms between column lines 11 and 6 and work appears complete. None of the balconies are complete yet. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
FIR19-00316 INSP-Final Inspection5/13/20195/13/20195/13/2019 1:55:54 PMPCANC
Contact is Jeff Phone #: ###-#### Inspection requested via web by Chris Green
FIR19-00316 INSP-Sprinkler Rough-in5/13/20195/13/20195/13/2019 1:55:40 PMPFAIL
Contractor could not make it to the project when I was there.Contact is Jeff Phone #: ###-#### Inspection requested via web by Chris Green
FIR19-00309 INSP-Sprinkler Rough-in5/10/20195/13/20195/13/2019 1:37:06 PMPPASS
Todays inspection was for the second floor only. Piping can be covered but a second cover inspection will be needed when the soffits are installed.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00032 INSP-Sprinkler Rough-in/Hydro5/10/20195/13/20195/13/2019 12:58:50 PMAPASS
Underground hydro test witnessed with no loss on the guage

Gabe Garduno is the contact. This is for a hydro only, in connection with the flush scheduled for the same day and time. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00103 INSP-Sprinkler Rough-in/Hydro5/10/20195/13/20195/13/2019 12:56:50 PMAFAIL
Overhead hydro failed due to visible loss of pressure on the guages.

Gabe Garduno is the contact. This is for a hydro only inspection. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-00860 FIRE-Final Inspection5/10/20195/13/20195/13/2019 11:29:16 AMPCANC
Electrician is not done yet. To be rescheduled per John Phone #: ###-####
FIR19-00032 INSP-Supply line flush5/10/20195/13/20195/13/2019 10:46:47 AMAPASS
Underground supply line flush witnessed.
FIR19-00313 INSP-Final Inspection5/10/20195/13/20195/13/2019 9:56:04 AMAFAIL
There are still issues with strobe coverage. No testing performed. Chris Siewert, Technician Phone #: ###-#### Inspection requested via web by John Siewert
FIR19-00283 INSP-Final Inspection5/10/20195/13/20195/13/2019 9:09:50 AMACANC
Cancel per Nate Phone #: ###-####
FIR19-00265 INSP-Final Inspection5/9/20195/13/20195/13/2019 7:17:14 AMACANC
Phone #: 2086157641 >> Inspection requested via mobile web by Richard Johnson Inspection cancelled via mobile web on Monday, May 13, 2019.
FIR09-00510 FIR-Aging Inspection5/13/20195/13/20195/13/2019 6:13:28 AM CANC