FIR18-00789
| INSP-Supply line flush | 5/13/2019 | 5/13/2019 | 5/13/2019 3:31:27 PM | P | PASS |
|
|
Underground flush witnessed. Phone #: ###-#### Inspection requested via web by Sam Ball
|
NAF18-00124
| INSP-Conference | 5/13/2019 | 5/13/2019 | 5/13/2019 2:47:24 PM | P | DONE |
|
|
I performed a walk through of the Resident Areas of the first floor and it looks like sprinkler work is complete except for the waterheater closet in the corridor which has no ceiling. I did not look in the Riser Room. I performed the same walk through of the second floor for the Resident Rooms between column lines 11 and 6 and work appears complete. None of the balconies are complete yet. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
FIR19-00316
| INSP-Final Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 1:55:54 PM | P | CANC |
|
|
Contact is Jeff Phone #: ###-#### Inspection requested via web by Chris Green
|
FIR19-00316
| INSP-Sprinkler Rough-in | 5/13/2019 | 5/13/2019 | 5/13/2019 1:55:40 PM | P | FAIL |
|
|
Contractor could not make it to the project when I was there.Contact is Jeff Phone #: ###-#### Inspection requested via web by Chris Green
|
FIR19-00309
| INSP-Sprinkler Rough-in | 5/10/2019 | 5/13/2019 | 5/13/2019 1:37:06 PM | P | PASS |
|
|
Todays inspection was for the second floor only. Piping can be covered but a second cover inspection will be needed when the soffits are installed.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00032
| INSP-Sprinkler Rough-in/Hydro | 5/10/2019 | 5/13/2019 | 5/13/2019 12:58:50 PM | A | PASS |
|
|
Underground hydro test witnessed with no loss on the guage
Gabe Garduno is the contact. This is for a hydro only, in connection with the flush scheduled for the same day and time. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00103
| INSP-Sprinkler Rough-in/Hydro | 5/10/2019 | 5/13/2019 | 5/13/2019 12:56:50 PM | A | FAIL |
|
|
Overhead hydro failed due to visible loss of pressure on the guages.
Gabe Garduno is the contact. This is for a hydro only inspection. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-00860
| FIRE-Final Inspection | 5/10/2019 | 5/13/2019 | 5/13/2019 11:29:16 AM | P | CANC |
|
|
Electrician is not done yet. To be rescheduled per John Phone #: ###-####
|
FIR19-00032
| INSP-Supply line flush | 5/10/2019 | 5/13/2019 | 5/13/2019 10:46:47 AM | A | PASS |
|
|
Underground supply line flush witnessed.
|
FIR19-00313
| INSP-Final Inspection | 5/10/2019 | 5/13/2019 | 5/13/2019 9:56:04 AM | A | FAIL |
|
|
There are still issues with strobe coverage. No testing performed. Chris Siewert, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
FIR19-00283
| INSP-Final Inspection | 5/10/2019 | 5/13/2019 | 5/13/2019 9:09:50 AM | A | CANC |
|
|
Cancel per Nate Phone #: ###-####
|
FIR19-00265
| INSP-Final Inspection | 5/9/2019 | 5/13/2019 | 5/13/2019 7:17:14 AM | A | CANC |
|
|
Phone #: 2086157641 >> Inspection requested via mobile web by Richard Johnson Inspection cancelled via mobile web on Monday, May 13, 2019.
|
FIR09-00510
| FIR-Aging Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 6:13:28 AM | | CANC |
|
|
|