BLD19-00685
| FIRE-Final Inspection | 5/14/2019 | 5/15/2019 | 5/15/2019 2:20:17 PM | P | FAIL |
|
|
Provide exit discharge lights at both exits as per the city approved plans and note #5 on the reflected ceiling plan.
Floyd-please call 30 minutes prior Phone #: ###-####
|
FIR19-00221
| INSP-Sprinkler Rough-in | 5/15/2019 | 5/15/2019 | 5/15/2019 1:27:13 PM | P | PASS |
|
|
See the city approved plans for area marked on the north half of the third floor where tenting is approved and the sprinkler piping can be coverd.
Tom Phone #: ###-####
|
BLD19-00094
| FIRE-Final Inspection | 5/15/2019 | 5/15/2019 | 5/15/2019 12:28:48 PM | P | PASS |
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by Pat Churchman
|
BLD19-00191
| FIRE-Final Inspection | 5/15/2019 | 5/15/2019 | 5/15/2019 12:28:06 PM | P | PASS |
|
|
Life safety passed.
Phone #: ###-#### Inspection requested via web by Pat Churchman
|
BLD19-00194
| FIRE-Final Inspection | 5/15/2019 | 5/15/2019 | 5/15/2019 10:37:57 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Pat Churchman Inspection cancelled from web by: Pat Churchman
|
FIR19-00312
| INSP-Sprinkler Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 9:58:08 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered. Contact is Nick Phone #: ###-#### Inspection requested via web by Chris Green
|
FIR19-00103
| INSP-Sprinkler Rough-in/Hydro | 5/14/2019 | 5/15/2019 | 5/15/2019 9:55:32 AM | A | FAIL |
|
|
Overhead hydro tests failed again do to visible loss on the guages. A re-inspection fee has been applied.
|
FIR19-00300
| INSP-Sprinkler Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 8:17:57 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.Janason Phone #: ###-####
|
FIR19-00189
| INSP-Final Inspection | 5/14/2019 | 5/15/2019 | 5/15/2019 8:17:26 AM | A | FAIL |
|
|
Not ready for a final but the rough-in passed and piping can be covered. Janason Phone #: ###-####
|