Inspections for the day of: Thursday, May 2, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00803 FIRE-Final Inspection5/2/20195/2/20195/2/2019 2:31:38 PMPPASS
Life safety passed.

Kevin Phone #: ###-#### Inspection requested via web by Kevin Antonucci
FIR18-00930 INSP-Final Inspection5/2/20195/2/20195/2/2019 2:30:53 PMPPASS
Permit finaled
FIR18-00525 INSP-Sprinkler Rough-in5/1/20195/2/20195/2/2019 2:22:59 PMPPASS
The piping above the hardlids in the first floor southwest restrooms and Corridor/Entry Lobby is ok to cover. Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00640 INSP-Conference5/2/20195/2/20195/2/2019 2:05:40 PMPDONE
I spoke to the building contractor about requirements for heat for the wet pipe system above the office.The contact is Cade. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00216 INSP-Sprinkler Rough-in5/2/20195/2/20195/2/2019 2:04:22 PMPPASS
Underground rough to cover is passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Hunter Fillmore
FIR18-00716 INSP-Final Inspection5/1/20195/2/20195/2/2019 1:33:02 PMPFAIL
need the interconnections with the fire alarm tested. Need ceiling at the ground floor north apartment repaired. All other areas the work appears complete.


Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00826 INSP-Final Inspection5/1/20195/2/20195/2/2019 1:31:18 PMPFAIL
Need the interconnection with the fire alarm system tested and balcony ceilings installed. Walk through of the apartments passed..

Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-01892 FIRE-Final Inspection5/2/20195/2/20195/2/2019 12:36:57 PMPPASS
life safety passed

Kevin Phone #: ###-####
BLD19-00277 FIRE-Final Inspection5/2/20195/2/20195/2/2019 12:35:49 PMPPASS
life safety passed

Kevin Phone #: ###-####
FIR19-00101 INSP-Sprinkler Rough-in/Hydro5/1/20195/2/20195/2/2019 12:26:37 PMPFAIL
Provide missing sprinkler head in bay window of master bedroom or provide exception, sprinkler heads are overspaced from the ceiling transition edge in the Kitchen area, provide sprinkler coverage under the second floor walkway as discussed, fix tenting as discussed. See the city approved plans for locations. Also the hydro test failed due to visible loss of pressure on the guage.
BLD17-00944 FIRE-Final Inspection5/1/20195/2/20195/2/2019 11:25:17 AMAFAIL
Repair the exit signs and provide the exit discharge light as per plans. Phone #: ###-#### Inspection requested via web by Bob Thornton
NAF19-00038 INSP-Final5/1/20195/2/20195/2/2019 10:19:26 AMAFAIL
Plan mods are needed for one hood due to changed nozzles numbers and one additional nozzle at the grill. All nozzles/piping needs braced and tightened so it does not spin in the fittings. Lights need to be repaired so shut off upon activation of the suppression system can be verified.

Call prior to going Phone #: 2086319935 >> Inspection requested via mobile web by Nate
FIR19-00077 INSP-Sprinkler Rough-in5/1/20195/2/20195/2/2019 8:58:20 AMAPASS
See the city approved plans for areas on the second floor where piping is ok for cover. Tom and I went over sprinkler coverage in/below the clouds.

Tom Phone #: ###-####
FIR17-00612 INSP-Sprinkler Rough-in4/30/20195/2/20195/2/2019 8:18:36 AMAPASS
24 hour air test witnessed with no visible loss on the guage.
FIR19-00258 INSP-Sprinkler Rough-in5/1/20195/2/20195/2/2019 12:00:00 AMPPASS
*** UG between main house and garage only. OK to cover. Trace wire to be added and left exposed on the interior to be inspected later. MAS***
Cover inspection for UG feed to garage. Please call Lonnie with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham
FIR18-00525 INSP-Sprinkler Rough-in5/1/20195/2/20195/1/2019 3:54:44 PMACANC
Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus