NAF19-00056
| INSP-Sprinkler Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 3:16:54 PM | P | PART |
|
|
Sprinkler spacing appears ok for State Fires scope of work but I noted painted heads, missing hangers. It also appears that the existing light fixtures/architectual features are blocking the pendant heads. This issues needs to be addressed now, which will require a plan modification, if it is with-in the building permit scope of work. If outside of the scope of work then the Boise Fire Dept will follow up for corrections.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR19-00311
| INSP-Final Inspection | 5/17/2019 | 5/20/2019 | 5/20/2019 3:10:06 PM | P | FAIL |
|
|
Provide correct tamper switch, provide the smoke detector with-in 5' of the panel on the wall as discussed, clear the trouble signal on the FACP as discussed, provide knox key box, provide testing of devices.
Please call 30min before so I can meet on-site Phone #: ###-#### Inspection requested via web by Kyle Burgess
|
FIR19-00310
| INSP-Final Inspection | 5/17/2019 | 5/20/2019 | 5/20/2019 3:09:39 PM | P | FAIL |
|
|
Provide correct tamper switch, provide the smoke detector with-in 5' of the panel on the wall as discussed, clear the trouble signal on the FACP as discussed, provide knox key box, provide testing of devices. Phone #: ###-#### Inspection requested via web by Kyle Burgess
|
BLD19-00508
| FIRE-Final Inspection | 5/20/2019 | 5/20/2019 | 5/20/2019 2:05:27 PM | P | FAIL |
|
|
Need possible racking permit for the racks along the walls after discussion with the building inspector. Please contact the plan reviewer for clarification. All other life safety items appear ok.
Christian Phone #: 208-###-####
|
FIR19-00339
| INSP-Sprinkler Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 1:02:46 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered. Adam Phone #: ###-####
|
FIR19-00309
| INSP-Sprinkler Rough-in | 5/17/2019 | 5/20/2019 | 5/20/2019 10:22:46 AM | P | PART |
|
|
Tenting is not complete for the third floor. Rough-in for the first and third floors is complete except for acouple of tie-ins at the Breezeway. Riser room tenting is not complete.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
NAF19-00019
| INSP-Supply line flush | 5/17/2019 | 5/20/2019 | 5/20/2019 10:16:46 AM | A | PASS |
|
|
Underground supply line flush witnessed. Call prior to going Phone #: 2089148171 >> Inspection requested via mobile web by Brian
|
FIR19-00235
| INSP-Final Inspection | 5/17/2019 | 5/20/2019 | 5/20/2019 9:34:51 AM | A | PASS |
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Mick Woodburn
|