BLD19-00095
| FIRE-Final Inspection | 5/21/2019 | 5/21/2019 | 5/21/2019 2:48:22 PM | P | PASS |
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by Michael McHargue
|
FIR19-00060
| INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/21/2019 | 5/21/2019 2:24:35 PM | P | FAIL |
|
|
A tenting inspection was requested but no tenting has been installed.
Nick Phone #: ###-####
|
FIR19-00303
| INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/21/2019 | 5/21/2019 2:16:47 PM | P | PASS |
|
|
The underground supply piping hydro test was witnessed with no pressure loss.
Please call Troy with time frame. UG Hydro Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR18-00787
| INSP-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 1:44:51 PM | P | PASS |
|
|
Permit finaled.
Robert Chambers is the contact. He request that he be given a call an hour before the inspection so he can meet the inspector at the site. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00568
| INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/21/2019 | 5/21/2019 1:36:09 PM | P | PASS |
|
|
The underground supply line hydro test was witnessed with no pressure loss.
|
FIR18-00435
| INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/21/2019 | 5/21/2019 12:53:12 PM | P | FAIL |
|
|
The first floor overhead hydro test failed due to visible loss on the guage.
|
FIR18-00435
| INSP-Sprinkler Rough-in/Hydro | 5/20/2019 | 5/21/2019 | 5/21/2019 11:19:13 AM | A | PASS |
|
|
The 2nd floor overhead hydro test was witnessed with no loss of pressure.
|
FIR18-00789
| INSP-Sprinkler Rough-in | 5/21/2019 | 5/21/2019 | 5/21/2019 10:02:58 AM | P | CANC |
|
|
2 nd floor apartments and 4th floor corridor. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
BLD19-01159
| FIRE-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 9:51:02 AM | A | FAIL |
|
|
Provide annual inspection for the sprinkler system, provide annual inspection for the fire extinguisher, provide paddle hardware as per plans for the west exit door, provide sticker at the south main exit door, provide sprinkler coverage in the two small closets.
Scott-please call for access code Phone #: ###-####
|
FIR18-00916
| INSP-Sprinkler Rough-in | 5/20/2019 | 5/21/2019 | 5/21/2019 9:09:58 AM | A | PART |
|
|
Todays inspection was for the piping above the ceiling tile on the first floor. Piping can be covered except for where I need to verify the correct earth quake devices have been used.
Contact Andrew Larson ###-#### 30 min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00568
| INSP-Sprinkler Rough-in/Hydro | 5/20/2019 | 5/21/2019 | 5/21/2019 9:07:20 AM | A | FAIL |
|
|
I started the hydro but the contractor contacted me and stated that it would not pass due to excessive loss.
TROY IS OUR FOREMAN THIS IS AN UNDERGROUND HYDRO Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
BLD19-00095
| FIRE-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 9:01:16 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Adam Joslin Inspection cancelled from web by: Michael McHargue
|
FIR18-00787
| INSP-Final Inspection | 5/17/2019 | 5/21/2019 | 5/20/2019 3:28:39 PM | P | CANC |
|
|
Colton Cox is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|