Inspections for the day of: Tuesday, May 21, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00095 FIRE-Final Inspection5/21/20195/21/20195/21/2019 2:48:22 PMPPASS
Life safety passed

Phone #: ###-#### Inspection requested via web by Michael McHargue
FIR19-00060 INSP-Sprinkler Rough-in/Hydro5/21/20195/21/20195/21/2019 2:24:35 PMPFAIL
A tenting inspection was requested but no tenting has been installed.

Nick Phone #: ###-####
FIR19-00303 INSP-Sprinkler Rough-in/Hydro5/21/20195/21/20195/21/2019 2:16:47 PMPPASS
The underground supply piping hydro test was witnessed with no pressure loss.

Please call Troy with time frame. UG Hydro Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR18-00787 INSP-Final Inspection5/20/20195/21/20195/21/2019 1:44:51 PMPPASS
Permit finaled.

Robert Chambers is the contact. He request that he be given a call an hour before the inspection so he can meet the inspector at the site. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00568 INSP-Sprinkler Rough-in/Hydro5/21/20195/21/20195/21/2019 1:36:09 PMPPASS
The underground supply line hydro test was witnessed with no pressure loss.
FIR18-00435 INSP-Sprinkler Rough-in/Hydro5/21/20195/21/20195/21/2019 12:53:12 PMPFAIL
The first floor overhead hydro test failed due to visible loss on the guage.
FIR18-00435 INSP-Sprinkler Rough-in/Hydro5/20/20195/21/20195/21/2019 11:19:13 AMAPASS
The 2nd floor overhead hydro test was witnessed with no loss of pressure.
FIR18-00789 INSP-Sprinkler Rough-in5/21/20195/21/20195/21/2019 10:02:58 AMPCANC
2 nd floor apartments and 4th floor corridor. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
BLD19-01159 FIRE-Final Inspection5/20/20195/21/20195/21/2019 9:51:02 AMAFAIL
Provide annual inspection for the sprinkler system, provide annual inspection for the fire extinguisher, provide paddle hardware as per plans for the west exit door, provide sticker at the south main exit door, provide sprinkler coverage in the two small closets.

Scott-please call for access code Phone #: ###-####
FIR18-00916 INSP-Sprinkler Rough-in5/20/20195/21/20195/21/2019 9:09:58 AMAPART
Todays inspection was for the piping above the ceiling tile on the first floor. Piping can be covered except for where I need to verify the correct earth quake devices have been used.

Contact Andrew Larson ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00568 INSP-Sprinkler Rough-in/Hydro5/20/20195/21/20195/21/2019 9:07:20 AMAFAIL
I started the hydro but the contractor contacted me and stated that it would not pass due to excessive loss.


TROY IS OUR FOREMAN THIS IS AN UNDERGROUND HYDRO Phone #: ###-#### Inspection requested via web by Brad Bettencourt
BLD19-00095 FIRE-Final Inspection5/20/20195/21/20195/21/2019 9:01:16 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Adam Joslin Inspection cancelled from web by: Michael McHargue
FIR18-00787 INSP-Final Inspection5/17/20195/21/20195/20/2019 3:28:39 PMPCANC
Colton Cox is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus