BLD19-02390
| FIRE-Final Inspection | 5/27/2020 | 5/27/2020 | 5/27/2020 3:22:27 PM | P | CANC |
|
|
Inspection was for a conference. As per comments on FIR15-00908 the fire alarm system was to be upgraded prior to the next remodel. I discussed issue with Todd with the Boise Fire Dept. He stated the need for the fire alarm system to be upgraded as previously discussed in 2016 prior to a sign off on this remodel project.
screened - consult only // Nicol Phone #: ###-####
|
BLD20-00924
| FIRE-Final Inspection | 5/27/2020 | 5/27/2020 | 5/27/2020 3:06:38 PM | P | PASS |
|
|
Life safety passed. Owner to provide sticker as discussed prior to a building inspection.
Screeened- John Phone #: ###-####
|
BLD20-00886
| FIRE-Final Inspection | 5/26/2020 | 5/27/2020 | 5/27/2020 3:05:36 PM | P | PASS |
|
|
Life safety passed. Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
BLD20-00100
| FIRE-Final Inspection | 5/26/2020 | 5/27/2020 | 5/27/2020 10:57:34 AM | A | PART |
|
|
Life safety passed for Exam Rooms 1 and 2 which are phase 1.
We are trying to final out the first phase (two rooms) it order for the client to move to that side to be able to begin the second phase.
Thanks, Dana Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
FIR19-00949
| INSP-Supply line flush | 5/27/2020 | 5/27/2020 | 5/27/2020 10:22:06 AM | A | PASS |
|
|
The underground supply line flush was witnessed. Please call Troy Nelson for time of inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR19-00949
| INSP-Sprinkler Rough-in/Hydro | 5/27/2020 | 5/27/2020 | 5/27/2020 10:21:34 AM | A | PASS |
|
|
The underground hydro test was witnessed with no pressure loss.
Please call Troy Nelson for time of inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
BLD19-03873
| FIRE-Final Inspection | 5/26/2020 | 5/27/2020 | 5/27/2020 8:39:42 AM | A | PASS |
|
|
life safety passed.
Eddie Phone #: ###-####
|