Inspections for the day of: Monday, May 6, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00267 INSP-Final Inspection5/6/20195/6/20195/6/2019 3:44:36 PMPCANC
BLD17-04612 FIRE-Final Inspection5/3/20195/6/20195/6/2019 3:39:19 PMPPASS
Life safety passed. Contractor is going to provide an occupant load sign for the Conference room prior to a building inspection.

Jeff Phone #: ###-####
FIR19-00302 INSP-Final Inspection5/3/20195/6/20195/6/2019 2:37:46 PMPPASS
Permit finaled

Please call Jack at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
FIR18-00918 INSP-Final Inspection5/3/20195/6/20195/6/2019 2:37:46 PMPPASS
Permit finaled

Contact name is Raul Phone #: ###-#### Inspection requested via web by Chris Green
FIR19-00060 INSP-Sprinkler Rough-in5/6/20195/6/20195/6/2019 2:28:25 PMPPART
Rough-in passed but piping can not be covered until a tenting inspection has passed.

Nick Phone #: ###-####
NAF19-00018 INSP-Final5/6/20195/6/20195/6/2019 1:37:14 PMPDONE
life safety passed

Call prior to going Phone #: 2086066055 >> Inspection requested via mobile web by Annie
FIR19-00059 INSP-Sprinkler Rough-in5/6/20195/6/20195/6/2019 1:20:14 PMPPASS
Rough-in passed. Tenting passed. Piping can be covered. The wet pipe in the exterior closets will need addressed as per previous conversations.

###-#### Nick
NAF18-00124 INSP-Sprinkler Rough-in5/6/20195/6/20195/6/2019 1:18:37 PMPPASS
Verified E.Q. bracing at first floor riser and giving ok to cover for east end of the third floor corridor.

Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
FIR19-00156 INSP-Final Inspection5/3/20195/6/20195/6/2019 1:15:06 PMAPASS
Permit finaled
BLD19-01464 FIRE-Final Inspection5/3/20195/6/20195/6/2019 12:34:54 PMACANC
Wrong permit number scheduled. Brandi Phone #: ###-####
BLD18-03446 FIRE-Final Inspection5/3/20195/6/20195/6/2019 11:18:37 AMAFAIL
Provide the bollards for the fire hydrant protection as per the plans and provide corrected door hardware as per conversation.

Call to be badged in // Rick Phone #: ###-####
FIR18-00916 INSP-Sprinkler Rough-in5/3/20195/6/20195/6/2019 11:17:44 AMAFAIL
Todays inspection was for the first floor hardlids. Piping can not be covered because the approved plans show 1 1/4" starters but 1" has been installed. Also no branchline restraints have been installed. There were no small documents or notes on site. I appears the trapeze bracing attachment rods are too small.


Contact Andrew Larson ###-#### 30 Min Prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00156 INSP-Sprinkler Rough-in5/3/20195/6/20195/6/2019 9:49:20 AMAPASS
Rough-in passed. Corrections made. Permit can be finaled when alarm interconnections are verified.
FIR19-00267 INSP-Sprinkler Rough-in5/3/20195/6/20195/6/2019 8:40:12 AMAPASS
The sprinkler piping above the hardlids is ok for cover.

Contact Leroy Anderson ###-#### 30 min prior to RTC insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD18-04402 FIRE-Final Inspection5/3/20195/6/20195/6/2019 7:13:24 AMAPASS
life safety passed. Mike Phone #: ###-####
FIR19-00126 INSP-Sprinkler Rough-in5/6/20195/6/20195/6/2019 12:00:00 AMPFAIL
** Head needs to be added on other side of duct. If sheetrock doen't go all the way to the deck a head outside the chase on both sides of the duct would be acceptable.***MAS***
Contact Ken Orahood - ###-#### 30 min prior to RTC Insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank