FIR18-00913
| INSP-Conference | 6/10/2019 | 6/10/2019 | 6/10/2019 3:45:43 PM | P | DONE |
|
|
I let Andrew know that if they need to repair the underground piping a new flush and hydro would be required.
|
FIR19-00145
| INSP-Final Inspection | 6/8/2019 | 6/10/2019 | 6/10/2019 2:52:08 PM | P | FAIL |
|
|
Need to test the flow switch, need to test the two duct smoke detectors, need as-builts.
Phone #: ###-#### Inspection requested via web by John Lopez
|
BLD19-00261
| FIRE-Final Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 2:13:44 PM | P | FAIL |
|
|
Jason and I went over life safety requirements to allow occupancy in part of the scope of work. Jason Phone #: ###-####
|
FIR19-00328
| INSP-Sprinkler Rough-in | 6/7/2019 | 6/10/2019 | 6/10/2019 12:54:06 PM | P | PASS |
|
|
3 heads in hardlids for bathrooms are ok for cover on the second floor.. Phone #: ###-#### Inspection requested via web by Sam Ball
|
BLD19-00238
| FIRE-Final Inspection | 6/7/2019 | 6/10/2019 | 6/10/2019 11:35:01 AM | A | PART |
|
|
A temp for life safety is ok until the required NFPA Medical Gas Signage has been provided on the Medical Gas Room door.
Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD19-00956
| FIRE-Final Inspection | 6/7/2019 | 6/10/2019 | 6/10/2019 10:54:43 AM | A | PASS |
|
|
Life safety passed
Chad Phone #: ###-####
|
FIR19-00303
| INSP-Final Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 10:54:06 AM | P | PASS |
|
|
Underground Finaled.
Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
BLD19-00242
| FIRE-Final Inspection | 6/6/2019 | 6/10/2019 | 6/10/2019 9:10:47 AM | A | FAIL |
|
|
The only item ready for testing/inspection was the smoke evac system which functioned correctly.
David Phone #: ###-####
|