BLD18-01080
| FIRE-Final Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 3:54:24 PM | P | PASS |
|
|
life safety passed
Matt Phone #: ###-####
|
BLD18-00902
| FIRE-Final Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 2:41:11 PM | P | CANC |
|
|
Permit already finaled.
Chad Phone #: ###-####
|
FIR19-00247
| INSP-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 2:40:47 PM | P | PASS |
|
|
Permit finaled
Tony Phone #: ###-####
|
BLD19-01605
| FIRE-Final Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 2:05:00 PM | P | FAIL |
|
|
Need to mount the fire extinguisher as discussed and provide single action hardware on the new interior doors and rear exit door. The main exit door needs to have the thumbturn deadbolt removed and sticker provided (keyed is ok)
Josh Phone #: ###-####
|
FIR19-00267
| INSP-Sprinkler Rough-in | 6/18/2019 | 6/19/2019 | 6/19/2019 2:03:44 PM | P | PASS |
|
|
Rough-in passed on the remaining piping. Piping can be covered.
Contact Perly Daniel ###-#### 30 min prior to RTC Insp strat please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
BLD18-02967
| FIRE-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 12:57:19 PM | P | PASS |
|
|
Life safety passed.
Joe Phone #: ###-####
|
FIR19-00340
| INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 12:45:41 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00328
| INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 12:44:48 PM | P | PASS |
|
|
The work at the remaining pendants is complete. Piping can be covered.
Look at the rest of the heads around the bathrooms. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00383
| INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 12:33:00 PM | P | PART |
|
|
See the city approved plans for heads marked "ok" where piping can be covered.
Looking at the unoccupied half for now. If possible look at it later in the afternoon they are working on it now. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00698
| INSP-Sprinkler Rough-in/Hydro | 6/18/2019 | 6/19/2019 | 6/19/2019 12:14:14 PM | A | FAIL |
|
|
Underground hydro test failed due to visible loss on the guage.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00697
| INSP-Sprinkler Rough-in/Hydro | 6/18/2019 | 6/19/2019 | 6/19/2019 12:13:36 PM | A | FAIL |
|
|
Underground hydro failed due to visible loss on the guage
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
NAF19-00062
| INSP-Final | 6/18/2019 | 6/19/2019 | 6/19/2019 11:12:48 AM | A | FAIL |
|
|
Provide single action hardware on the exterior exit as discussed, provide city approved plans and notes, provide additional fire extinguisher on the mezzanine and repair the exit sign/emergency light.
Call prior to going Phone #: 2083767373 >> Inspection requested via mobile web by Dean
|
FIR19-00221
| INSP-Sprinkler Rough-in | 6/18/2019 | 6/19/2019 | 6/19/2019 10:52:22 AM | A | PASS |
|
|
See the city approved plans for the piping ok to cover in the third floor south building lobby. It has been clouded with todays date.
Tom Phone #: ###-####
|
NAF18-00086
| INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 10:07:47 AM | P | CANC |
|
|
Contact Andrew Larson - ###-#### 30 min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
GRD18-00064
| FIRE-Final Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 9:44:15 AM | P | PASS |
|
|
Life safety passed. Modified fire dept access has been re-submitted under the BLD permit.
Frankie Phone #: ###-####
|
BLD18-02795
| FIRE-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 9:43:32 AM | A | PART |
|
|
A temporary for life safety is ok with Chief Ron's permission until the elevator has been installed and tested. Chad Phone #: ###-####
|
FIR18-00698
| INSP-Supply line flush | 6/18/2019 | 6/19/2019 | 6/19/2019 9:42:40 AM | A | PASS |
|
|
Supply line re-flush witnessed
|
FIR18-00697
| INSP-Supply line flush | 6/18/2019 | 6/19/2019 | 6/19/2019 9:42:06 AM | A | PASS |
|
|
Supply line re-flush witnessed
|
FIR19-00046
| INSP-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 9:37:55 AM | A | PASS |
|
|
Permit finaled
|
FIR19-00340
| INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 9:08:57 AM | P | CANC |
|
|
The rest of the heads are done upstairs. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
NAF19-00019
| INSP-Sprinkler Rough-in/Hydro | 6/19/2019 | 6/19/2019 | 6/19/2019 12:00:00 AM | P | PASS |
|
|
Call prior to going Phone #: 2089148171 >> Inspection requested via mobile web by Brian
|