BLD17-02419
| FIRE-Final Inspection | 6/22/2018 | 6/22/2018 | 6/22/2018 3:17:36 PM | P | FAIL |
|
|
102 smoke alarms did not ring back. 104 head under stairs issue.
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD17-02413
| FIRE-Final Inspection | 6/22/2018 | 6/22/2018 | 6/22/2018 3:14:04 PM | P | FAIL |
|
|
!02 mech rm ceiling issues, 104 both mech room wall/ceiling issues and canopy missing from bedroom, 103 mech rm ceiling issues.
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD17-00959
| FIRE-Final Inspection | 6/21/2018 | 6/22/2018 | 6/22/2018 2:44:27 PM | A | PASS |
|
|
Life safety passed
Cecil Phone #: ###-####
|
FIR18-00094
| INSP-Alarm Testing | 6/21/2018 | 6/22/2018 | 6/22/2018 2:43:34 PM | A | DONE |
|
|
Today we finished up the marked corrections on the 4th floor including dampers but no elevator control. But programming has been changed so that the room detectors/sounder bases activate upon another rooms supervisory alarm. This needs to be corrected and devices retested. We went to the 3rd and 2nd floors and found that the room detector/sounder bases are also incorrect. So I inspected the fire dampers on the 3rd and 2nd floors. The detectors will need to be spot check for functionality on the 4th floor and 100% checks on the remaining floors. No elevator has been tested. The strobes in the Handicap rooms still do not have the weather proof boxes installed. The dampers at the top of the elevator shafts functioned.
Rand Phone #: ###-####
|
BLD18-00902
| FIRE-Final Inspection | 6/21/2018 | 6/22/2018 | 6/22/2018 11:21:09 AM | A | PART |
|
|
A temporary is being given with Adele's permission until the bollards have been installed at the Nitrogen tank and a racking permit is provided for the new storage racks.
Please call ahead for access, 30min - Jedera Phone #: ###-####
|
FIR18-00286
| INSP-Sprinkler Rough-in/Hydro | 6/21/2018 | 6/22/2018 | 6/22/2018 11:18:57 AM | A | PASS |
|
|
The remaining underground supply piping is ok for cover. Also the underground supply piping hydro test passed.
Call Anthony to coordinate, underground rough/hydro Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD18-00669
| FIRE-Final Inspection | 6/21/2018 | 6/22/2018 | 6/22/2018 10:00:03 AM | A | PASS |
|
|
life safety passed
Jim-call 30 minutes prior Phone #: ###-####
|
BLD18-00643
| FIRE-Final Inspection | 6/21/2018 | 6/22/2018 | 6/22/2018 9:59:15 AM | A | PASS |
|
|
Life safety passed
Jim-call 30 minutes prior Phone #: ###-####
|
NAF18-00061
| INSP-Sprinkler Rough-in | 6/21/2018 | 6/22/2018 | 6/22/2018 7:51:34 AM | A | PASS |
|
|
The rough-in for the wet and dry systems in the west wing is passed. A tenting inspection is needed before a cover approval is given. Per the contractor plans have been resubmitted.
Call prior to going Phone #: 2084774515 >> Inspection requested via mobile web by Jeremiah
|
BLD18-01795
| FIRE-Final Inspection | 6/21/2018 | 6/22/2018 | 6/22/2018 7:46:37 AM | A | PASS |
|
|
Life safety passed
Tim Phone #: ###-####
|