Inspections for the day of: Friday, June 26, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00363 FIRE-Final Inspection6/26/20206/26/20206/26/2020 3:37:03 PMPFAIL
Inspection was actually for a conferene to go over life safety items. I agreed a fire lane sign could be mounted on the wall at the property entrance. I pointed out the requirement for panic hardware in the path of egress from the Break Room. Break Room would also need Occupant Load sign, need Fire Dept radio verified per notes, need signage on Riser Room and Electrical Rooms doors....ect.

Herb *screened* Phone #: ###-####
FIR20-00410 INSP-Final Inspection6/25/20206/26/20206/26/2020 3:34:09 PMPFAIL
No testing performed due to no access to the Riser Room because of a freshly poured concrete pad.

The tech you will be meeting is Jason Petty. Please call 15-20 Minutes prior to arrival. Phone #: ###-#### Inspection requested via web by jason petty
FIR19-00516 INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020 3:33:14 PMAPASS
Piping in the 7th floor resident rooms, that is above the soffits, is ok for cover. Also one pendant in the soffit in the west side common corridor. Tony adjusted some of the hangers while I was there.

Tony Cetani is the contact and this inspection will be for the 7th floor. Thanks so much!! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-00565 FIRE-Final Inspection6/24/20206/26/20206/26/2020 12:08:01 PMAFAIL
Provide plan mods showing the actual new door locations and actual door swing direction, provide sprinkler and fire alarm modifications (permits) for the required changes due to the new wall installations.

screened // Dustin Phone #: ###-####
FIR20-00428 INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020 11:41:56 AMAPASS
See city approved plans for two locations where the sprinkler piping is ok to cover above the hard lids.

Please contact Adam for inspection time. This inspection for 2 sprinkler heads in hard lids. Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR20-00313 INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020 10:55:37 AMAPASS
The two apartments, third floor, east side of breeze way, tenting is passed. Piping can be covered.

Matt ..... screened Phone #: ###-####
FIR20-00416 INSP-Final Inspection6/23/20206/26/20206/26/2020 10:30:01 AMAPASS
Permit finaled. Inspection performed by Greg.

Screened- Nate Phone #: ###-####
FIR19-00789 INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020 9:51:16 AMAPASS
The underground supply line rough-in passed. Piping is ok for cover.

screened // Mike Phone #: ###-####
FIR20-00142 INSP-Final Inspection6/24/20206/26/20206/26/2020 8:42:45 AMAPASS
Permit finaled. Inspection performed by Greg.
Kc Strykowski, Tech Phone #: ###-#### Inspection requested via web by John Siewert
FIR20-00449 INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020 8:07:47 AMAPASS
Rough-in passed. Piping is ok for cover.

Please contact Terry Nelson for inspection time. We have 3 different permits scheduled for inspections at Pinnacle Square. Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR20-00450 INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020 8:06:50 AMAPASS
Rough-in passed. Piping is ok for cover.

Please contact Terry Nelson for inspection time. We have 3 different permits scheduled for inspections at Pinnacle Square. Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR20-00448 INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020 8:05:58 AMAPASS
Rough-in passed. Piping is ok for cover.

Please contact Terry Nelson for inspection time. We have 3 different permits scheduled for inspections at Pinnacle Square. Phone #: ###-#### Inspection requested via web by Daniel Buccino