Inspections for the day of: Monday, June 3, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00882 INSP-Sprinkler Rough-in/Hydro6/3/20196/3/20196/3/2019 2:34:37 PMPPASS
The overhead hydro passed with no visible loss at the guage.

Mike Phone #: ###-####
FIR18-00614 INSP-Final Inspection6/3/20196/3/20196/3/2019 2:33:49 PMPPASS
permit finaled.

Mike Phone #: ###-####
FIR19-00084 INSP-Final Inspection6/3/20196/3/20196/3/2019 11:43:06 AMPPASS
Permit finaled.

Adam Phone #: ###-####
NAF19-00034 INSP-Final6/3/20196/3/20196/3/2019 11:32:43 AMPPART
Need to repair or remove the old/existing emergency lights in the Sales Area, provide the new exit signs in the other rooms as per the approved plans, remove the thumbturn deadbolts from all four main exit doors. I'm ok for the store to be "stocked" but can not be open for business until the above corrections have been addressed.

Call prior to going Phone #: 4056425898 >> Inspection requested via mobile web by Michael
FIR19-00221 INSP-Sprinkler Rough-in/Hydro6/3/20196/3/20196/3/2019 11:30:36 AMPPASS
Underground supply line hydro test witnessed.

Please call Troy Nelson Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR19-00221 INSP-Supply line flush6/3/20196/3/20196/3/2019 11:30:04 AMPCANC
To be rescheduled per Troy.

Please call Troy Nelson Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR18-00701 INSP-Sprinkler Rough-in/Hydro6/3/20196/3/20196/3/2019 11:29:20 AMPPASS
System A rough-in passed and piping can be covered. System A overhead hydro test witnessed with no pressure loss.

Mike Phone #: ###-####
NAF19-00053 INSP-Final5/31/20196/3/20196/3/2019 10:34:50 AMADONE
Permit finaled


Contact is Raul Phone #: ###-#### Inspection requested via web by Chris Green