FIR18-00732
| INSP-Final Inspection | 6/3/2019 | 6/4/2019 | 6/6/2019 3:17:06 PM | P | FAIL |
|
|
Permit will be ok for final when as-builts are approved.
Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
FIR19-00364
| INSP-Sprinkler Rough-in | 6/3/2019 | 6/4/2019 | 6/4/2019 2:42:39 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00809
| INSP-Alarm Testing | 6/3/2019 | 6/4/2019 | 6/4/2019 2:34:56 PM | P | DONE |
|
|
Nathan and I did a walk through. I verified notification device placement and noted several areas where they need to be relocated and/or added. I also verified the FACP/NAC/Dialer model. No actual test could be performed due to the sprinkler system keeping the FACP busy with signals at this time. No elevator has been installed yet. As-builts will be required per our conversation prior to a final testing.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR18-00916
| INSP-Sprinkler Rough-in/Hydro | 6/3/2019 | 6/4/2019 | 6/4/2019 2:07:57 PM | A | NR |
|
|
Not ready for hydro test due to modifications needed. I noted that the below mezzanine piping is not controled separately as per Boise Fire Prevention Code Chapter 12; 5-12-51 "Floor Control". Also it appears a control valve on the discharge side of the fire pump "note 22" has not been installed. I need to contact plan review on other items listed in NFPA 20 that may need to be addressed.
Apparently the fire pump certification was performed without a Boise City Representative present as required per NFPA 20 14.2.2. I requested to be present several times to the onsite sprinkler fitter and the general contractor.
Contact Andrew Larson ###-#### 30 Min Prior to RTC insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR19-00221
| INSP-Supply line flush | 6/3/2019 | 6/4/2019 | 6/4/2019 10:12:00 AM | A | PASS |
|
|
The underground supply line flush was witnessed.
Please contact Troy Nelson Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR19-00032
| INSP-Final Inspection | 6/3/2019 | 6/4/2019 | 6/4/2019 9:15:09 AM | A | PASS |
|
|
Permit finaled
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00103
| INSP-Final Inspection | 6/3/2019 | 6/4/2019 | 6/4/2019 9:14:26 AM | A | PASS |
|
|
Permit finaled
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-03485
| FIRE-Final Inspection | 6/3/2019 | 6/4/2019 | 6/4/2019 8:49:45 AM | A | PASS |
|
|
Life safety passed. Life safety/Egress plan provided and letter of intent to be scaned to case file. This life safety plan to be provided by the Apartment Leasing Office to each tenant at move in. Bill Phone #: ###-####
|
BLD19-01811
| FIRE-Final Inspection | 5/31/2019 | 6/4/2019 | 6/4/2019 8:16:47 AM | A | CANC |
|
|
Cancel per Janice. Signage is not ready. Phone #: ###-####
|
FIR19-00374
| INSP-Sprinkler Rough-in | 6/3/2019 | 6/4/2019 | 6/4/2019 8:14:05 AM | A | PART |
|
|
Rough-in passed for the second floor, Piping can be covered except for the 1 1/2" drop downs at the BreezeWay since they have not been installed yet.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|