Inspections for the day of: Tuesday, June 4, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00732 INSP-Final Inspection6/3/20196/4/20196/6/2019 3:17:06 PMPFAIL
Permit will be ok for final when as-builts are approved.

Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
FIR19-00364 INSP-Sprinkler Rough-in6/3/20196/4/20196/4/2019 2:42:39 PMPPASS
Rough-in passed. Piping can be covered. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00809 INSP-Alarm Testing6/3/20196/4/20196/4/2019 2:34:56 PMPDONE
Nathan and I did a walk through. I verified notification device placement and noted several areas where they need to be relocated and/or added. I also verified the FACP/NAC/Dialer model. No actual test could be performed due to the sprinkler system keeping the FACP busy with signals at this time. No elevator has been installed yet. As-builts will be required per our conversation prior to a final testing.

Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
FIR18-00916 INSP-Sprinkler Rough-in/Hydro6/3/20196/4/20196/4/2019 2:07:57 PMANR
Not ready for hydro test due to modifications needed. I noted that the below mezzanine piping is not controled separately as per Boise Fire Prevention Code Chapter 12; 5-12-51 "Floor Control". Also it appears a control valve on the discharge side of the fire pump "note 22" has not been installed. I need to contact plan review on other items listed in NFPA 20 that may need to be addressed.

Apparently the fire pump certification was performed without a Boise City Representative present as required per NFPA 20 14.2.2. I requested to be present several times to the onsite sprinkler fitter and the general contractor.

Contact Andrew Larson ###-#### 30 Min Prior to RTC insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00221 INSP-Supply line flush6/3/20196/4/20196/4/2019 10:12:00 AMAPASS
The underground supply line flush was witnessed.

Please contact Troy Nelson Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR19-00032 INSP-Final Inspection6/3/20196/4/20196/4/2019 9:15:09 AMAPASS
Permit finaled


Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00103 INSP-Final Inspection6/3/20196/4/20196/4/2019 9:14:26 AMAPASS
Permit finaled

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-03485 FIRE-Final Inspection6/3/20196/4/20196/4/2019 8:49:45 AMAPASS
Life safety passed. Life safety/Egress plan provided and letter of intent to be scaned to case file. This life safety plan to be provided by the Apartment Leasing Office to each tenant at move in.
Bill Phone #: ###-####
BLD19-01811 FIRE-Final Inspection5/31/20196/4/20196/4/2019 8:16:47 AMACANC
Cancel per Janice. Signage is not ready. Phone #: ###-####
FIR19-00374 INSP-Sprinkler Rough-in6/3/20196/4/20196/4/2019 8:14:05 AMAPART
Rough-in passed for the second floor, Piping can be covered except for the 1 1/2" drop downs at the BreezeWay since they have not been installed yet.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus