BLD17-01294
| FIRE-Final Inspection | 6/5/2018 | 6/5/2018 | 6/5/2018 3:35:16 PM | P | FAIL |
|
|
Life safety will be ok to pass when the plan reviewer accepts the revised wall layout for Server Room 109
Gene Phone #: ###-####
|
FIR18-00326
| INSP-Final Inspection | 6/4/2018 | 6/5/2018 | 6/5/2018 3:34:29 PM | A | FAIL |
|
|
Will be ok to final when the as-builts have been accepted.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR17-00771
| INSP-Sprinkler Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 3:27:58 PM | A | PASS |
|
|
24 hour air passed
|
BLD18-00217
| FIRE-Final Inspection | 6/5/2018 | 6/5/2018 | 6/5/2018 2:55:01 PM | P | FAIL |
|
|
Provide ADA approved single action hardware as discussed, provide sticker at the exit as discussed, remove the thumbturn deadbolt as discussed (keyed is ok). See notes on the city approved drawings.
Matt Phone #: ###-####
|
FIR18-00074
| INSP-Final Inspection | 6/5/2018 | 6/5/2018 | 6/5/2018 1:32:05 PM | P | PASS |
|
|
Permit finaled. Mechanical inspector has approved the appliance layout
Dave Phone #: ###-####
|
FIR17-00522
| INSP-Sprinkler Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 1:28:30 PM | A | PASS |
|
|
The remaining first floor piping is ok for cover. The previous corrections noted have been corrected.
hallways and rooms with grid Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
FIR18-00411
| INSP-Sprinkler Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 1:27:37 PM | P | PASS |
|
|
The piping in apartments 105, 205, 305, 106, 206 306 is ok for cover.
Robert Chambers is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-00902
| FIRE-Final Inspection | 6/4/2018 | 6/5/2018 | 6/5/2018 12:11:00 PM | A | FAIL |
|
|
Not ready for inspection yet. No plans or small documents on site, fire extinguishers expired, a paint booth is being installed, it appears a large portion of a CMU wall has been removed, fire alarm panel is non-functional, need verification of fire sprinkler one year and five year inspections....ect.
Chad-- please call 30 mins before Phone #: ###-####
|
FIR18-00338
| INSP-Final Inspection | 6/4/2018 | 6/5/2018 | 6/5/2018 11:15:33 AM | A | FAIL |
|
|
Several of the horn/strobes, as marked on the plans, are overspaced. We did not set off the notification circuit.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
FIR18-00129
| INSP-Sprinkler Rough-in/Hydro | 6/1/2018 | 6/5/2018 | 6/5/2018 11:11:25 AM | A | PART |
|
|
The 200lb overhead hydro for the pre-action system passed. The 24 hour air test was started at 9:30 with 45psi on the guage.
Contact Andrew Larson ###-#### 30 min prior to Hydro 24 hr Test start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00221
| INSP-Final Inspection | 6/1/2018 | 6/5/2018 | 6/5/2018 11:10:20 AM | A | PASS |
|
|
Permit finaled. This scope of work was for phase 1
Please set for as early as possible. Tony Burtlow is the Tech on Site. Phone #: ###-#### Inspection requested via web by David Oliver
|
FIR18-00411
| INSP-Sprinkler Rough-in | 6/4/2018 | 6/5/2018 | 6/4/2018 4:41:53 PM | A | CANC |
|
|
Robert Chambers is the contact for the rough-in for the 24-plex. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|