Inspections for the day of: Tuesday, June 5, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-01294 FIRE-Final Inspection6/5/20186/5/20186/5/2018 3:35:16 PMPFAIL
Life safety will be ok to pass when the plan reviewer accepts the revised wall layout for Server Room 109

Gene Phone #: ###-####
FIR18-00326 INSP-Final Inspection6/4/20186/5/20186/5/2018 3:34:29 PMAFAIL
Will be ok to final when the as-builts have been accepted.

Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
FIR17-00771 INSP-Sprinkler Rough-in6/4/20186/5/20186/5/2018 3:27:58 PMAPASS
24 hour air passed
BLD18-00217 FIRE-Final Inspection6/5/20186/5/20186/5/2018 2:55:01 PMPFAIL
Provide ADA approved single action hardware as discussed, provide sticker at the exit as discussed, remove the thumbturn deadbolt as discussed (keyed is ok). See notes on the city approved drawings.

Matt Phone #: ###-####
FIR18-00074 INSP-Final Inspection6/5/20186/5/20186/5/2018 1:32:05 PMPPASS
Permit finaled. Mechanical inspector has approved the appliance layout

Dave Phone #: ###-####
FIR17-00522 INSP-Sprinkler Rough-in6/4/20186/5/20186/5/2018 1:28:30 PMAPASS
The remaining first floor piping is ok for cover. The previous corrections noted have been corrected.

hallways and rooms with grid Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR18-00411 INSP-Sprinkler Rough-in6/4/20186/5/20186/5/2018 1:27:37 PMPPASS
The piping in apartments 105, 205, 305, 106, 206 306 is ok for cover.

Robert Chambers is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-00902 FIRE-Final Inspection6/4/20186/5/20186/5/2018 12:11:00 PMAFAIL
Not ready for inspection yet. No plans or small documents on site, fire extinguishers expired, a paint booth is being installed, it appears a large portion of a CMU wall has been removed, fire alarm panel is non-functional, need verification of fire sprinkler one year and five year inspections....ect.


Chad-- please call 30 mins before Phone #: ###-####
FIR18-00338 INSP-Final Inspection6/4/20186/5/20186/5/2018 11:15:33 AMAFAIL
Several of the horn/strobes, as marked on the plans, are overspaced. We did not set off the notification circuit.

Phone #: ###-#### Inspection requested via web by Ken Webster
FIR18-00129 INSP-Sprinkler Rough-in/Hydro6/1/20186/5/20186/5/2018 11:11:25 AMAPART
The 200lb overhead hydro for the pre-action system passed. The 24 hour air test was started at 9:30 with 45psi on the guage.


Contact Andrew Larson ###-#### 30 min prior to Hydro 24 hr Test start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00221 INSP-Final Inspection6/1/20186/5/20186/5/2018 11:10:20 AMAPASS
Permit finaled. This scope of work was for phase 1


Please set for as early as possible. Tony Burtlow is the Tech on Site. Phone #: ###-#### Inspection requested via web by David Oliver
FIR18-00411 INSP-Sprinkler Rough-in6/4/20186/5/20186/4/2018 4:41:53 PMACANC
Robert Chambers is the contact for the rough-in for the 24-plex. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus