Inspections for the day of: Wednesday, June 7, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00269 INSP-Final Inspection6/7/20176/7/20176/7/2017 2:47:17 PMPCANC
BLD17-01704 FIRE-Final Inspection6/6/20176/7/20176/7/2017 2:36:51 PMPFAIL
Provide panic hardware, exit signs and emergency lighting at both west facing exterior exit doors.

Steve Phone #: ###-####
FIR16-00821 INSP-Sprinkler Rough-in6/6/20176/7/20176/7/2017 1:51:47 PMPPASS
See the city approved plans for locations where piping can be covered marked with todays date.
BLD16-03774 FIRE-Final Inspection6/6/20176/7/20176/7/2017 1:51:04 PMPFAIL
Need the project related fire alarm and fire sprinkler pemits addressed. Need single action hardware on the north office door, need correct fire extinguishers in warehouse, need signage on the Electrical Room/Fire Alarm Panel door.
FIR17-00269 INSP-Alarm Testing6/6/20176/7/20176/7/2017 1:49:37 PMPFAIL
Pull station is too high, smoke detector is too low, need document box, need to secure the outlet for the dialer. All other items tested ok
FIR17-00002 INSP-Final Inspection6/7/20176/7/20176/7/2017 1:47:53 PMPPASS
permit finaled. Forward flow passed. No storage racking at this time
FIR16-00811 INSP-Final Inspection6/7/20176/7/20176/7/2017 1:46:33 PMPPASS
Permit finaled
FIR17-00080 INSP-Sprinkler Rough-in6/6/20176/7/20176/7/2017 10:00:17 AMAPASS
The exterior canopy at the south building, east end is complete and sprinkler rough-in passed. Piping can be covered.
BLD17-00230 FIRE-Final Inspection6/6/20176/7/20176/7/2017 9:59:23 AMAPART
Phase 1 construction life safety passed. Waiting for remaining construction and racking permit for final.