FIR17-00269
| INSP-Final Inspection | 6/7/2017 | 6/7/2017 | 6/7/2017 2:47:17 PM | P | CANC |
|
|
|
BLD17-01704
| FIRE-Final Inspection | 6/6/2017 | 6/7/2017 | 6/7/2017 2:36:51 PM | P | FAIL |
|
|
Provide panic hardware, exit signs and emergency lighting at both west facing exterior exit doors.
Steve Phone #: ###-####
|
FIR16-00821
| INSP-Sprinkler Rough-in | 6/6/2017 | 6/7/2017 | 6/7/2017 1:51:47 PM | P | PASS |
|
|
See the city approved plans for locations where piping can be covered marked with todays date.
|
BLD16-03774
| FIRE-Final Inspection | 6/6/2017 | 6/7/2017 | 6/7/2017 1:51:04 PM | P | FAIL |
|
|
Need the project related fire alarm and fire sprinkler pemits addressed. Need single action hardware on the north office door, need correct fire extinguishers in warehouse, need signage on the Electrical Room/Fire Alarm Panel door.
|
FIR17-00269
| INSP-Alarm Testing | 6/6/2017 | 6/7/2017 | 6/7/2017 1:49:37 PM | P | FAIL |
|
|
Pull station is too high, smoke detector is too low, need document box, need to secure the outlet for the dialer. All other items tested ok
|
FIR17-00002
| INSP-Final Inspection | 6/7/2017 | 6/7/2017 | 6/7/2017 1:47:53 PM | P | PASS |
|
|
permit finaled. Forward flow passed. No storage racking at this time
|
FIR16-00811
| INSP-Final Inspection | 6/7/2017 | 6/7/2017 | 6/7/2017 1:46:33 PM | P | PASS |
|
|
Permit finaled
|
FIR17-00080
| INSP-Sprinkler Rough-in | 6/6/2017 | 6/7/2017 | 6/7/2017 10:00:17 AM | A | PASS |
|
|
The exterior canopy at the south building, east end is complete and sprinkler rough-in passed. Piping can be covered.
|
BLD17-00230
| FIRE-Final Inspection | 6/6/2017 | 6/7/2017 | 6/7/2017 9:59:23 AM | A | PART |
|
|
Phase 1 construction life safety passed. Waiting for remaining construction and racking permit for final.
|