BLD18-00567
| FIRE-Conference | 7/10/2018 | 7/10/2018 | 7/10/2018 2:11:11 PM | P | DONE |
|
|
The project superintendant and I discussed the requirement for a fire alarm permit for the work being performed and also the need for a racking permit for the existing storage racks that exceed 8'
|
BLD18-00902
| FIRE-Final Inspection | 7/10/2018 | 7/10/2018 | 7/10/2018 2:10:05 PM | P | PASS |
|
|
Life safety passed
Chad Phone #: ###-####
|
BLD18-02091
| FIRE-Final Inspection | 7/6/2018 | 7/10/2018 | 7/10/2018 1:13:05 PM | A | FAIL |
|
|
Contact fire plan review and provide required/requested information on any gases/chemicals for a more detailed plan review of this occupancy, Also provide compliant hardware as discussed for the two required exterior exit doors and relocate the fire extinguisher.
Tim Phone #: ###-####
|
FIR18-00426
| INSP-Sprinkler Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 9:46:45 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
NAF18-00061
| INSP-Sprinkler Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 9:41:57 AM | A | PASS |
|
|
The remaining tenting passed except for the vertical piping in the main corridor/north side. The previous corrections have been addressed.
|
BLD18-00238
| FIRE-Final Inspection | 7/9/2018 | 7/10/2018 | 7/10/2018 9:39:47 AM | A | CANC |
|
|
Wrong permit number and contact
Caitlin Phone #: ###-####
|
BLD18-02196
| FIRE-Final Inspection | 7/9/2018 | 7/10/2018 | 7/10/2018 9:39:07 AM | A | PASS |
|
|
life safety passed
Sid Phone #: ###-####
|