BLD17-00339
| FIRE-Hydro test above ground | 7/13/2018 | 7/13/2018 | 7/13/2018 3:48:16 PM | P | CANC |
|
|
Duplicate inspection
|
FIR17-00412
| INSP-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 3:47:47 PM | P | PASS |
|
|
permit finaled
. forward flush passed
Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-00339
| FIRE-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 3:46:28 PM | P | FAIL |
|
|
Need all ceiling tile installed, Engineering Room complete (plan mod) and the project related fire alarm permit finaled. Per Ron Johnson a temporary will be ok when all of the ceiling tile has been installed
Ross is the super. Scheduling a final in the event our hardware and tile get done in time. We got approval to cover today. Also scheduled a conference to review as much as we can and then finish Monday if we have to. Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
BLD17-00339
| FIRE-Conference | 7/12/2018 | 7/13/2018 | 7/13/2018 3:43:45 PM | P | PART |
|
|
Fire life safety walk through - em lights, exit lights, egress lights, hardware and ceiling tile will be in progress for a final on Monday. Would like to get as much as we can looked at Friday and finish up Monday with the fire sprinkler contractor. (There is a chance we might achieve everything by Friday afternoon so will request a final as well) Phone #: ###-#### Inspection requested via web by Jackie Phelps
|
FIR18-00057
| INSP-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 3:42:50 PM | P | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00683
| INSP-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 3:42:25 PM | P | PART |
|
|
Temporary being given until as-builts submitted/approved showing the address changes, deleting PIV and deleting tamper at the knox box.
Phone #: ###-#### Inspection requested via web by Gary Gambino
|
BLD17-04653
| FIRE-Conference | 7/12/2018 | 7/13/2018 | 7/13/2018 12:59:23 PM | P | DONE |
|
|
Conference was for direction on suppression requirements for 46 "woks" that are being installed. Fire suppression systems will be required as per IMC type 1 hood requirements and the manufactures/UL requirements.
Dave Phone #: ###-####
|
NAF18-00087
| INSP-Sprinkler Rough-in/Hydro | 7/12/2018 | 7/13/2018 | 7/13/2018 11:09:56 AM | P | PART |
|
|
General rough-in for overhead pipe passed. I noted in the Kitchen area the pendant is not placed as per plan and may be too close to the oven when installed. I noted in the Dining room the pendant head is too far off of the stair wall (8' max.) and the stair landing at this same location has no sprinkler protection. Plans have been marked in red at corrections. First ansnd second floor piping can be covered but third floor piping can not until a tenting inspection has been passed. Heads have not been verified (no ladder) and neither has the pump/riser. The riser piping will need to be steel due to the cpvc piping is not listed to be more than 1 1/2" from walls.
Call ahead to coordinate time, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00139
| INSP-Sprinkler Rough-in/Hydro | 7/13/2018 | 7/13/2018 | 7/13/2018 10:59:52 AM | P | PASS |
|
|
underground hydro test passed
- Troy Phone #: ###-####
|
NAF18-00061
| INSP-Final | 7/13/2018 | 7/13/2018 | 7/13/2018 8:24:57 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Matthew Lewis
|
FIR17-00596
| INSP-Sprinkler Rough-in | 7/12/2018 | 7/13/2018 | 7/13/2018 8:21:14 AM | A | PASS |
|
|
The remaining piping can be covered.
|