FIR17-00364
| INSP-Final Inspection | 7/20/2018 | 7/23/2018 | 7/23/2018 3:19:02 PM | A | FAIL |
|
|
Waiting on as-builts to be submitted/approved then this permit can be finaled
Rafe Phone #: ###-####
|
BLD17-01088
| FIRE-Final Inspection | 7/20/2018 | 7/23/2018 | 7/23/2018 3:18:17 PM | A | FAIL |
|
|
Life safety will be ok to pass when the project related fire alarm permit is finaled.
Barry Phone #: ###-####
|
FIR18-00012
| INSP-Sprinkler Rough-in | 7/23/2018 | 7/23/2018 | 7/23/2018 2:56:18 PM | P | FAIL |
|
|
Shilo, again, scheduled the wrong permit. This underground permit is scheduled, for a rough-in and a overhead hydro. The correct permit to be scheduled should be for the overhead piping. I went to the project anyway and found un-insppected piping covered with insulation and the dry wall contractor covering sprinkler piping as I watched. I asked him to stop and he told me go talk to Pat. I stopped the inspection until all piping is exposed.
Hrdro above ground Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-02461
| FIRE-Final Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 2:26:07 PM | P | FAIL |
|
|
Provide approved hardware at the main exit as discussed. Either keyed with sticker or single action lever type.
Crystal Phone #: ###-####
|
FIR18-00559
| INSP-Alarm Testing | 7/20/2018 | 7/23/2018 | 7/23/2018 2:10:22 PM | P | PASS |
|
|
Permit finaled
John Phone #: ###-####
|
NAF17-00089
| INSP-Final | 7/23/2018 | 7/23/2018 | 7/23/2018 12:30:02 PM | P | PASS |
|
|
Life safety passed
Call prior to going Phone #: 2089187128 >> Inspection requested via mobile web by Jason
|
BLD18-01148
| FIRE-Final Inspection | 7/20/2018 | 7/23/2018 | 7/23/2018 10:14:56 AM | A | PASS |
|
|
Life safety passed. No alarm or sprinkler work.
Kevin- won''t be in town until 930am Phone #: ###-####
|
BLD18-01975
| FIRE-Final Inspection | 7/20/2018 | 7/23/2018 | 7/23/2018 9:59:11 AM | A | PASS |
|
|
Life safety passed
Robert Phone #: ###-####
|
FIR18-00524
| INSP-Final Inspection | 7/20/2018 | 7/23/2018 | 7/23/2018 9:58:49 AM | A | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Connie Danes
|
FIR17-00507
| INSP-Supply line flush | 7/20/2018 | 7/23/2018 | 7/23/2018 9:51:29 AM | A | CANC |
|
|
Not ready. Will be rescheduled
Todd Ketterling is the contact for this underground hydro and flush. Troy is aware of inspection needs and will contact Todd. Stacey with Suez is also aware. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00507
| INSP-Sprinkler Rough-in/Hydro | 7/20/2018 | 7/23/2018 | 7/23/2018 9:50:05 AM | A | PASS |
|
|
The underground hydro test passed.
|
FIR17-00771
| INSP-Sprinkler Rough-in | 7/20/2018 | 7/23/2018 | 7/23/2018 7:27:07 AM | A | PASS |
|
|
Pendant head rough-in passed. Will need two pendants added for the space above the coolers or the area blocked off as discussed. Piping can be covered.
Jonathon Phone #: ###-####
|
FIR17-00364
| INSP-Final Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 7:26:09 AM | A | FAIL |
|
|
The new smoke detector failed to operate. Still need as-builts.
|