Inspections for the day of: Thursday, July 25, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00007 INSP-Final Inspection7/25/20197/25/20197/25/2019 2:32:25 PMPFAIL
No inspection performed. Fitter did not have means to flow water through an orfice to match the installed sprinkler pendants. No other items looked at. Will need to reschedule.

Call Anthony to coordinate time before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD18-01631 FIRE-Conference7/25/20197/25/20197/25/2019 2:09:41 PMPDONE
Carrie and I went over her life safety comments
BLD19-01243 FIRE-Final Inspection7/24/20197/25/20197/25/2019 2:08:42 PMPFAIL
Provide emergency lighting as discussed and mount the fire extinguishers as discussed.

tOD Phone #: ###-####
FIR19-00482 INSP-Alarm Testing7/24/20197/25/20197/25/2019 1:40:47 PMPFAIL
The notification (horns) did not sync as required per NFPA 72 18.4.2.4. Need as-builts approved. Thanks for coming out yesterday Troy. I apologize for the inefficiency. I (We) know better than to waist your time. Learned something new about the spare Simplex NAC output used as a trigger. Call me when you feel you can make it. Thanks Mike
Phone #: ###-#### Inspection requested via web by Michael Timmerman
BLD18-03923 FIRE-Final Inspection7/24/20197/25/20197/25/2019 1:39:47 PMPPART
Life safety is being given a partial for the remodeled office area behind the new check-in counter. Brandon Phone #: ###-####
BLD19-02773 FIRE-Final Inspection7/25/20197/25/20197/25/2019 1:37:21 PMPPASS
Life safety passed
NAF18-00124 INSP-Sprinkler Rough-in/Hydro7/24/20197/25/20197/25/2019 10:33:04 AMAPASS
The hydro tests for both overhead wet systems witnessed with no pressure loss.
Call prior to going Phone #: 2088801974 >> Inspection requested via mobile web by Tyler
BLD19-02773 FIRE-Final Inspection7/25/20197/25/20197/25/2019 10:29:54 AMAFAIL
Provide drawings and small documents, repair or remove the non-functional exit signs
BLD19-02773 FIRE-Final Inspection7/24/20197/25/20197/25/2019 8:05:14 AMAFAIL
Called twice. Went to project site. No one was there. No inspection performed.

Lyndsey- call for access Phone #: ###-####
FIR19-00375 INSP-Final Inspection7/24/20197/25/20197/24/2019 2:55:43 PMAPASS
Permit finaled

Troy - Per our phone conversation on 7/24, this has been scheduled per your verbal..

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD18-03923 FIRE-Final Inspection7/24/20197/25/20197/24/2019 2:52:32 PMAPART
Life safety is passed for the Lobby area but not the back office area. Per discussion emergency lighting will be required for the existing lobby prior to a final sign off just as it is being required at the bottom of both stairwells.

Brandon Phone #: ###-####