BLD17-01528
| FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 3:19:45 PM | P | PASS |
|
|
Life safety passed
|
FIR17-00307
| INSP-Sprinkler Rough-in/Hydro | 7/24/2017 | 7/26/2017 | 7/26/2017 2:22:30 PM | P | PASS |
|
|
Overhead hydro test and rough-in passed. Piping can be covered.
|
NAF17-00032
| INSP-Final | 7/26/2017 | 7/26/2017 | 7/26/2017 1:56:04 PM | P | FAIL |
|
|
Provide hydro test, provide cage for upright under stairs and provide the insulation in the crawl space.
|
FIR09-00510
| FIR-Aging Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 1:55:18 PM | | NR |
|
|
Waiting for contractor to schedule work
|
BLD17-00214
| FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 1:51:23 PM | A | PASS |
|
|
Life safety passed
|
FIR17-00342
| INSP-Final Inspection | 7/24/2017 | 7/26/2017 | 7/26/2017 1:32:48 PM | A | PASS |
|
|
Permit finaled
|
GRD16-00067
| FIRE-Final Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 12:51:59 PM | P | PASS |
|
|
Life safety passed
Dick Phone #: ###-####
|
BLD16-03484
| FIRE-Final Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 12:51:37 PM | P | CANC |
|
|
No life safety sign off required.
Dick Phone #: ###-####
|
BLD17-00783
| FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 12:50:50 PM | A | CANC |
|
|
Per conversation with plan review the basement needs to be addressed. No inspection performed. I spoke to Alberto about what I need.
Alberto Phone #: ###-####
|
BLD16-02889
| FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 11:46:09 AM | A | PASS |
|
|
Life safety passed. Building inspector will verify that the correct hardware is installed on the east exit door.
|
FIR17-00386
| INSP-Sprinkler Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 11:10:31 AM | A | PASS |
|
|
Rough to cover inspection in the restrooms is passed. Piping can be covered.
|
BLD17-00931
| FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 10:30:24 AM | A | PASS |
|
|
Life safety passed.
|
BLD17-01371
| FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 10:23:13 AM | A | FAIL |
|
|
Todays inspection was for Phase 1 (north west quadrant). The project related fire alarm permit failed. Also I noted that the marked and unmarked egress doors from this area all have door magnets did not release on activation of the fire alarm system and are missing the rex (sensors) and per the review notes there is a 2016 BLD that did not allow the use of mags on the doors. So I'm requesting that the applicant provide a plan modification that gives approval to the requested locking arrangement. Also the egress plan has not been approved by the building code official and I noted that exiting will be going through construction areas from both required exits.
Jason Phone #: ###-####
|
FIR17-00318
| INSP-Alarm Testing | 7/25/2017 | 7/26/2017 | 7/26/2017 10:15:58 AM | A | FAIL |
|
|
Todays inspection was for phase 1 (north west quadrant). Notification did function but the doors did not release upon activation of the fire alarm system. Building plans are going to be resubmitted to see if the door mags will be allowed.
|
FIR17-00082
| INSP-Sprinkler Rough-in/Hydro | 7/25/2017 | 7/26/2017 | 7/26/2017 10:12:03 AM | A | PART |
|
|
An overhead 24 hour air test was started at 9am with pressure marked on the guage. Piping can be covered in the low ceiling rooms except for the room where the FDC drops down due to the draft stop for the CC2 heads. This draft stop exceeds the 1,000 square foot requirement and by relocating the draft stop heads may be effected. As-builts still need to be submitted to plan review.
|