Inspections for the day of: Wednesday, July 26, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-01528 FIRE-Final Inspection7/25/20177/26/20177/26/2017 3:19:45 PMPPASS
Life safety passed
FIR17-00307 INSP-Sprinkler Rough-in/Hydro7/24/20177/26/20177/26/2017 2:22:30 PMPPASS
Overhead hydro test and rough-in passed. Piping can be covered.
NAF17-00032 INSP-Final7/26/20177/26/20177/26/2017 1:56:04 PMPFAIL
Provide hydro test, provide cage for upright under stairs and provide the insulation in the crawl space.
FIR09-00510 FIR-Aging Inspection7/26/20177/26/20177/26/2017 1:55:18 PM NR
Waiting for contractor to schedule work
BLD17-00214 FIRE-Final Inspection7/25/20177/26/20177/26/2017 1:51:23 PMAPASS
Life safety passed
FIR17-00342 INSP-Final Inspection7/24/20177/26/20177/26/2017 1:32:48 PMAPASS
Permit finaled
GRD16-00067 FIRE-Final Inspection7/26/20177/26/20177/26/2017 12:51:59 PMPPASS
Life safety passed

Dick Phone #: ###-####
BLD16-03484 FIRE-Final Inspection7/26/20177/26/20177/26/2017 12:51:37 PMPCANC
No life safety sign off required.

Dick Phone #: ###-####
BLD17-00783 FIRE-Final Inspection7/25/20177/26/20177/26/2017 12:50:50 PMACANC
Per conversation with plan review the basement needs to be addressed. No inspection performed. I spoke to Alberto about what I need.

Alberto Phone #: ###-####
BLD16-02889 FIRE-Final Inspection7/25/20177/26/20177/26/2017 11:46:09 AMAPASS
Life safety passed. Building inspector will verify that the correct hardware is installed on the east exit door.
FIR17-00386 INSP-Sprinkler Rough-in7/25/20177/26/20177/26/2017 11:10:31 AMAPASS
Rough to cover inspection in the restrooms is passed. Piping can be covered.
BLD17-00931 FIRE-Final Inspection7/25/20177/26/20177/26/2017 10:30:24 AMAPASS
Life safety passed.
BLD17-01371 FIRE-Final Inspection7/25/20177/26/20177/26/2017 10:23:13 AMAFAIL
Todays inspection was for Phase 1 (north west quadrant). The project related fire alarm permit failed. Also I noted that the marked and unmarked egress doors from this area all have door magnets did not release on activation of the fire alarm system and are missing the rex (sensors) and per the review notes there is a 2016 BLD that did not allow the use of mags on the doors. So I'm requesting that the applicant provide a plan modification that gives approval to the requested locking arrangement. Also the egress plan has not been approved by the building code official and I noted that exiting will be going through construction areas from both required exits.

Jason Phone #: ###-####
FIR17-00318 INSP-Alarm Testing7/25/20177/26/20177/26/2017 10:15:58 AMAFAIL
Todays inspection was for phase 1 (north west quadrant). Notification did function but the doors did not release upon activation of the fire alarm system. Building plans are going to be resubmitted to see if the door mags will be allowed.
FIR17-00082 INSP-Sprinkler Rough-in/Hydro7/25/20177/26/20177/26/2017 10:12:03 AMAPART
An overhead 24 hour air test was started at 9am with pressure marked on the guage. Piping can be covered in the low ceiling rooms except for the room where the FDC drops down due to the draft stop for the CC2 heads. This draft stop exceeds the 1,000 square foot requirement and by relocating the draft stop heads may be effected. As-builts still need to be submitted to plan review.