FIR15-00223
| INSP-Sprinkler Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 3:17:54 PM | P | PASS |
|
|
Sprinkler rough-in and tenting inspection passed. Piping can be covered.
|
FIR15-00420
| INSP-Final Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 2:38:34 PM | P | FAIL |
|
|
Missing part of the city approved plans, on ceiling mounted strobe was overspace on the upper level, missing document box. The single strobe in the basement is overspaced and will not provide coverage in a pocket at the bottom of the stairs and in the area under the stairs. These two areas are not shown on the plans. Also the ceiling mounted duct work in the basement cuases an obstruction to the smoke detectors due to exceeding 10% of the ceiling height so spacing needs to be adjusted. I spoke to Lee and there is a possibility that the fire alarm system can be deleted from the basement if the contractor chooses not to provide modifications. Permission and as-builts will be needed prior to a final inspection. Also the address is incorrect. No actual testing was performed.
|
BLD15-01443
| FIRE-Final Inspection | 7/24/2015 | 7/28/2015 | 7/28/2015 12:13:51 PM | A | PASS |
|
|
life safety passed
|
FIR11-00296
| FIR-Aging Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 10:37:54 AM | | NR |
|
|
Per Scott the city of boise is working toward a resolution on the separate address monitoring
|
FIR15-00434
| INSP-Final Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 10:34:14 AM | P | PASS |
|
|
Permit finaled
|
FIR15-00434
| INSP-Sprinkler Rough-in/Hydro | 7/24/2015 | 7/28/2015 | 7/28/2015 10:33:10 AM | A | PASS |
|
|
Rough-in passed
|
BLD15-00478
| FIRE-Final Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 10:28:37 AM | A | FAIL |
|
|
See the city approved plans for location of deficiencies. They include tagging fire extinguisher, repairing exit sign, provide arrow on exit sign and correct door hardware.
|
FIR15-00455
| INSP-Sprinkler Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 10:13:19 AM | A | PASS |
|
|
Overhead piping is ok to cover
|
FIR15-00415
| INSP-Sprinkler Rough-in/Hydro | 7/27/2015 | 7/28/2015 | 7/28/2015 10:12:03 AM | A | PASS |
|
|
Overhead hydro test passed
|
FIR15-00335
| INSP-Sprinkler Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 9:43:21 AM | A | PASS |
|
|
The underground supply piping is ok to cover.
|
BLD15-01513
| FIRE-Final Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 9:22:14 AM | A | CANC |
|
|
Life Safety sign off not required.
|
FIR15-00222
| INSP-Sprinkler Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 9:21:43 AM | P | CANC |
|
|
And tenting Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
BLD15-00199
| FIRE-Final Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 9:20:29 AM | A | PART |
|
|
Phase 3 life safety passed
|
BLD13-03584
| FIRE-Final Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 9:13:35 AM | A | PASS |
|
|
Life Safety Passed
|
BLD13-03585
| FIRE-Final Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 8:12:54 AM | A | PASS |
|
|
Life Safety Passed
|
BLD15-01273
| FIRE-Final Inspection | 7/27/2015 | 7/28/2015 | 7/28/2015 7:45:36 AM | A | PASS |
|
|
Life safety passed
|