Inspections for the day of: Tuesday, July 7, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00836 INSP-Sprinkler Rough-in7/7/20207/7/20207/7/2020 4:30:34 PMPCANC
THIS IS AN UNDERGROUND COVER INSPECTION.
JUSTIN IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
FIR20-00191 INSP-Final Inspection7/6/20207/7/20207/7/2020 2:46:50 PMPPASS
permit finaled

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00361 INSP-Sprinkler Rough-in7/6/20207/7/20207/7/2020 2:32:28 PMAPASS
1st floor piping above the hardlids, as marked on the plans, is ok for cover.

Please call Chris Ford rough-in on the 1st floor please Phone #: ###-#### Inspection requested via web by Jessia McLain
BLD20-01684 FIRE-Conference7/7/20207/7/20207/7/2020 1:16:55 PMPDONE
Sprinkler protection will be required in the display windows on the back side of the new walls. Also the combustible concealed spaces will need to be addressed as discussed


SCREENED // Nicole Phone #: ###-####
FIR20-00439 INSP-Final Inspection7/7/20207/7/20207/7/2020 12:33:48 PMPPASS
Permit finaled.

Phone #: ###-#### Inspection requested via web by Daniel Buccino
BLD20-01441 FIRE-Final Inspection7/7/20207/7/20207/7/2020 12:33:01 PMPPASS
life safety passed. Provide keyed egress on main exit door.

Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison
FIR16-00241 INSP-Final Inspection7/6/20207/7/20207/7/2020 10:53:32 AMAPASS
Permit finaled.

BOR maintenance manager Mark Phone #: ###-#### Inspection requested via web by Nathan Stenquist
NAF19-00110 INSP-Final7/6/20207/7/20207/7/2020 10:32:46 AMADONE
Permit finaled.

Nate Phone #: ###-#### Inspection requested via web by Nathan Stenquist
FIR19-00779 INSP-Final Inspection7/6/20207/7/20207/7/2020 10:30:41 AMAFAIL
Not ready for final. I noted that the water was not turned on yet, pendants too close and I need verification that the sidewall sprinkler heads can be installed where they have been installed as far as distance from ceiling. Also need city approved plans and small documents.

Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00779 INSP-Supply line flush7/6/20207/7/20207/7/2020 10:29:03 AMAPASS
Underground supply line flush witnessed.

Coordinated for 9:30am with Jim Page and Pat with SUEZ. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00193 INSP-Final Inspection7/6/20207/7/20207/7/2020 9:00:47 AMAFAIL
No testing performed. Need city approved drawings and small documents. Need verification the interconnecting wire can be installed exposed between the FACP and the dialer.

Call Cameron Stone before to meet onsite Phone #: ###-#### Inspection requested via web by Kyle Burgess
BLD19-03923 FIRE-Final Inspection7/6/20207/7/20207/7/2020 8:01:37 AMAFAIL
Called three times, left one message. Went to project site and made no contact, doors locked. No inspection performed. WIll need to be rescheduled.

Items completed from failed inspection 07/06/2020. Phone #: ###-#### Inspection requested via web by Ron Ramza