PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, August 11, 2020
.
Number of inspections:
24
Percentage of inspections complete:
63 %
Percentage of inspections not complete:
38 %
Contact Information
Inspector
Troy Cobbley
Title
FIRE INSPECTOR
Phone #
794-9483
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
FIR14-00865
FIR-Aging Inspection
8/6/2020
8/6/2020
FIR14-00895
FIR-Aging Inspection
8/6/2020
8/6/2020
FIR15-00132
FIR-Aging Inspection
8/6/2020
8/6/2020
FIR13-00218
FIR-Aging Inspection
8/7/2020
8/7/2020
FIR14-00238
FIR-Aging Inspection
8/7/2020
8/7/2020
FIR14-00684
FIR-Aging Inspection
8/10/2020
8/10/2020
FIR19-00775
INSP-Final Inspection
8/11/2020
8/11/2020
8/11/2020 3:28:17 PM
P
PASS
Permit finaled.
screened // Tanner Phone #: ###-####
FIR19-00792
INSP-Sprinkler Rough-in/Hydro
8/10/2020
8/11/2020
8/11/2020 3:27:56 PM
A
PART
The standpipe, 1st and 2nd floor hydro tests witnessed. 3rd and 4th would not hold pressure.
Tanner - */Screened/* Phone #: ###-####
BLD18-03049
FIRE-Final Inspection
8/11/2020
8/11/2020
8/11/2020 1:53:24 PM
P
PASS
Life safety passed. Racking permit finaled.
BLD19-02069
FIRE-Final Inspection
8/10/2020
8/11/2020
8/11/2020 1:52:22 PM
A
PASS
life safety passed. Five single row racks shown on the plans located along the south wall have not been installed.> A separate permit will be required if these racks are installed.
Andy Lewcer Phone #: ###-#### Inspection requested via web by Jeff Higgins
FIR20-00317
INSP-Final Inspection
8/11/2020
8/11/2020
8/11/2020 12:48:09 PM
P
PASS
Permit finaled
FIR20-00313
INSP-Final Inspection
8/10/2020
8/11/2020
8/11/2020 12:47:46 PM
P
CANC
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-03923
FIRE-Final Inspection
8/11/2020
8/11/2020
8/11/2020 11:01:45 AM
P
PASS
Life safety passed.
David on-site contact 830.0212 Phone #: ###-#### Inspection requested via web by Ron Ramza
FIR20-00317
INSP-Sprinkler Rough-in
8/10/2020
8/11/2020
8/11/2020 10:53:47 AM
A
PASS
Rough-in passed.
Richard Clark is the contact. He would prefer this in the late AM. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR20-00466
INSP-Sprinkler Rough-in
8/11/2020
8/11/2020
8/11/2020 9:13:39 AM
A
PASS
The remaining underground supply piping is ok for cover.
Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00467
INSP-Sprinkler Rough-in
8/11/2020
8/11/2020
8/11/2020 9:13:23 AM
A
PASS
The remaining underground supply piping is ok for cover.
Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00469
INSP-Sprinkler Rough-in
8/11/2020
8/11/2020
8/11/2020 9:13:03 AM
A
PASS
The remaining underground supply piping is ok for cover.
Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR20-00468
INSP-Sprinkler Rough-in
8/11/2020
8/11/2020
8/11/2020 9:12:39 AM
A
PASS
The remaining underground supply piping is ok for cover.
Underground rough to cover at Suez connection point. Call Anthony before you head out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-03209
FIRE-Final Inspection
8/10/2020
8/11/2020
8/11/2020 8:29:43 AM
A
FAIL
Inspection was for phase 3 and 4. Need the fire alarm addressed in these areas, Need exit signs and emergency lightys repaired.
Schedule with fire alarm at 7am. Thank you Phone #: ###-#### Inspection requested via web by tom mccalister
FIR19-00827
INSP-Final Inspection
8/7/2020
8/11/2020
8/11/2020 8:28:39 AM
A
FAIL
As-builts needed showing the increase in candella in the two restrooms, The one and only duct smoke detector tested shut the unit down but did not report to the FACP. All duct smoke detectors will need to be tested. Notification is needed in the marked exit path through the east side office and the 30cd strobe needs to be located as per plans to provide coverage in the short corridor in front of the electrical room.
Need to sound bells at 7am prior to offices opening.
This is for phases 3 ; 4. Phone #: ###-#### Inspection requested via web by James Williams
BLD20-00670
FIRE-Final Inspection
8/10/2020
8/11/2020
8/10/2020 3:29:03 PM
A
CANC
Kitchen Remodel >> Inspection requested via web by David Thompson Inspection cancelled from web by: David Thompson
FIR14-00827
FIR-Aging Inspection
8/11/2020
8/11/2020
FIR15-00163
FIR-Aging Inspection
8/11/2020
8/11/2020
FIR15-00155
FIR-Aging Inspection
8/11/2020
8/11/2020