FIR19-00482
| INSP-Final Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 2:33:11 PM | P | PASS |
|
|
Permit finaled. Sync issue has been approved by Boise Fire.
Thanks Troy Have a terrific day. Phone #: ###-#### Inspection requested via web by Michael Timmerman
|
FIR19-00577
| INSP-Final Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 2:08:46 PM | P | PASS |
|
|
Permit finaled.
Brian Phone #: ###-####
|
BLD19-02115
| FIRE-Final Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 2:08:21 PM | P | PASS |
|
|
Life safety passed. Duane Phone #: ###-####
|
FIR19-00378
| INSP-Final Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 2:07:32 PM | P | FAIL |
|
|
Plan modifications are needed showing all changes. Strobes need to be added in the large boys and girls restrooms and in all classrooms with the partial height walls. We set off the notification and I could not see a reasonable effect of the strobe mounted in the center of the room. Most of the areas checked there was no effect seen. Notification devices have been added to rooms, not all rooms are shown on the plans, smoke detectors are over spaced in three locations at the front lobby, fire smoke dampers are shown on the plans. Some strobes are blocked (kitchen), some are overspaced off walls and some 15cd exceed the 10' max ceiling height allowance. Also this inspection/permit sign off needs to follow the other FIR for the head end equipment sign off. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00484
| INSP-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 12:16:30 PM | P | FAIL |
|
|
Called and left two messages on contacts voice mail. I went to project site by no one was there. Riser room door is locked. No inspection performed. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
FIR19-00569
| INSP-Sprinkler Rough-in | 8/12/2019 | 8/13/2019 | 8/13/2019 11:16:36 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover. Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
BLD19-00190
| FIRE-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 10:08:00 AM | A | PASS |
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Pat Churchman
|
BLD19-00192
| FIRE-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 10:07:33 AM | A | PASS |
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Pat Churchman
|
BLD19-00194
| FIRE-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 10:07:04 AM | A | PASS |
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by Pat Churchman
|
BLD19-00196
| FIRE-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 9:54:35 AM | A | PASS |
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Pat Churchman
|
BLD19-01891
| FIRE-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 9:07:09 AM | P | CANC |
|
|
No life safety sign off required.
kaleb Phone #: ###-####
|
FIR19-00482
| INSP-Alarm Testing | 8/12/2019 | 8/13/2019 | 8/13/2019 9:05:37 AM | A | PASS |
|
|
Permit finaled as per Boise Fire.
Hi Troy. Chief Johnson is going to let the synchronization slide for now. any future TIs in this location will more than likely require Hampton to Upgrade their fire alarm system. Let me know if this is just a sign off on your end or if we need to meet on site. Thanks Mike Phone #: ###-#### Inspection requested via web by Michael Timmerman
|
FIR19-00063
| INSP-Final Inspection | 8/9/2019 | 8/13/2019 | 8/13/2019 12:00:00 AM | A | FAIL |
|
|
** Liberty Tax Missing 1 escutcheon, Space 8073 No access, Foot Massage 1 head didn't get changed out in breakroom, H&R Block No Access, Daycare storage space missing 1 tile, and heads to close together, Also told daycare that their storage was stacked to high. A minimum of 18" clearance from storage to sprinkler heads is required. No Flow test performed unable to get alarms in test.*** MAS**
Phone #: ###-#### >> Inspection requested via web by Connie Danes
|