Inspections for the day of: Wednesday, August 29, 2018.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00478 INSP-Sprinkler Rough-in8/29/20188/29/20188/29/2018 3:03:46 PMPPASS
The remaining sprinkler piping can be covered.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00593 INSP-Final Inspection8/28/20188/29/20188/29/2018 2:37:25 PMPCANC
Not ready. To be rescheduled.

Ron Landreth is contact Phone #: ###-#### Inspection requested via web by jason petty
FIR18-00540 INSP-Sprinkler Rough-in8/28/20188/29/20188/29/2018 1:37:05 PMAPASS
The remaining underground piping is ok for cover.


Please coordinate Inspection for late am with Troy Nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
NAF18-00048 INSP-Supply line flush8/29/20188/29/20188/29/2018 1:01:30 PMPCANC
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Matthew Lewis
FIR18-00411 INSP-Final Inspection8/28/20188/29/20188/29/2018 12:53:19 PMACANC
Could not perform this inspection due to fire alarm issues.


partial final Phone #: ###-#### Inspection requested via web by Stan Beus
FIR17-00259 INSP-Final Inspection8/28/20188/29/20188/29/2018 12:39:58 PMAPASS
Permit finaled.


Rafe Phone #: ###-####
FIR18-00013 INSP-Final Inspection8/28/20188/29/20188/29/2018 11:32:18 AMAPASS
Permit finaled


Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00082 INSP-Final Inspection8/28/20188/29/20188/29/2018 11:17:19 AMAFAIL
Fire alarm system is not ready for inspection. To be rescheduled.


Final with the City and Shilo Sprinklers. Crane Alarm Tech Peter Naumov ###-#### Phone #: ###-#### Inspection requested via web by Laura Tyson
FIR18-00632 INSP-Sprinkler Rough-in8/28/20188/29/20188/29/2018 11:07:12 AMPFAIL
Plans need to be resubmitted showing the revised pipe routing, additional fittings and elevation changes so that a rough-in can be performed and the hydraulic calculations can be verified. Also inthe Batrooms the sprinkler pendants have been installed to where they no longer provide coverage into the shower areas. No sprinkler piping to be covered.

Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-02056 FIRE-Final Inspection8/29/20188/29/20188/29/2018 10:24:05 AMAPASS
Life safety passed. No alarm or sprinkler work.

Please call Kelly 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Brian McCoy
FIR18-00506 INSP-Final Inspection8/28/20188/29/20188/29/2018 10:06:14 AMACANC
Ceiling tile not installed per contractor. To be rescheduled


Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00582 INSP-Final Inspection8/28/20188/29/20188/29/2018 10:05:24 AMAPASS
Permit finaled

Contact Gordon and associated number for time. Phone #: ###-#### Inspection requested via web by Shane Lesteberg
BLD17-04595 FIRE-Final Inspection8/29/20188/29/20188/29/2018 9:28:25 AMACANC
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
BLD18-00992 FIRE-Conference8/29/20188/29/20188/29/2018 8:52:11 AMPDONE
We spoke of fire extinguisher placement, the removal of the shrubs obstructing the FDC, placement of the outside alarm bell at the FDC, and placement of the knox key box. We also discussed removing the ceiling T-bar wireing from the sprinkler piping.
FIR18-00373 INSP-Sprinkler Rough-in/Hydro8/28/20188/29/20188/29/2018 8:50:24 AMAPART
Overhead hydro witnessed and passed. Rough-in passed except branchline restraints are needed on almost all of the outriggers and also need to be place correctly on the grid branchlines, need the correct earth quake attachments used or resubmit the ones installed, provide clearance as discussed where the branchlines pass under structural members, provide verification the main entry canopy, which is not shown on the plans, does not require sprinkler protection above or below. Piping is ok to cover, as discussed, except in the areas where I need to re-verify work.

Phone #: ###-#### Inspection requested via web by Chris Green
BLD18-00955 FIRE-Final Inspection8/28/20188/29/20188/29/2018 7:14:32 AMAPASS
Life safety passed on 8/20/18

Byron Phone #: ###-####
FIR18-00130 INSP-Supply line flush8/28/20188/29/20188/29/2018 7:06:58 AMACANC
Scheduled for wrong day.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00130 INSP-Sprinkler Rough-in/Hydro8/28/20188/29/20188/29/2018 7:06:29 AMACANC
Scheduled for wrong day.

Underground Hydro Phone #: ###-#### Inspection requested via web by Stan Beus