Inspections for the day of: Wednesday, August 7, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00386 INSP-Conference8/6/20198/7/20198/7/2019 1:13:13 PMADONE
Plans are in review status but I did note that several of the corridor sidewall heads appear to be blocked by adjacent walls and lockers.

George Jess is the contact. He would like this to take place before the hydro. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00568 INSP-Sprinkler Rough-in8/7/20198/7/20198/7/2019 1:03:41 PMPCANC
Wrong permit scheduled.
FIR19-00374 INSP-Sprinkler Rough-in8/7/20198/7/20198/7/2019 12:59:40 PMPPASS
Tenting is passed for the two west most 3rd floor apartments. Piping can be covered.
FIR19-00386 INSP-Sprinkler Rough-in/Hydro8/6/20198/7/20198/7/2019 10:44:46 AMAPASS
The overhead hydro for the wet system was witnessed with no pressure loss. No rough-in inspection performed due to plans being in review status. George Jess is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
NAF19-00019 INSP-Sprinkler Rough-in/Hydro8/6/20198/7/20198/7/2019 9:56:06 AMAPASS
24 hour air test on dry system and hydrostatic test on wet system witnessed with no pressure loss. Phone #: ###-#### Inspection requested via web by Sam Ball
NAF19-00026 INSP-Sprinkler Rough-in8/6/20198/7/20198/7/2019 9:54:42 AMAPASS
Rough-in passed. Tenting passed. Piping can be covered. Original entry made under NAF19-00019.

Phone #: ###-#### Inspection requested via web by Sam Ball
NAF19-00027 INSP-Sprinkler Rough-in8/6/20198/7/20198/7/2019 9:54:13 AMAPASS
Rough-in passed. Tenting passed. Piping can be covered. Original entry made under NAF19-00019. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00531 INSP-Sprinkler Rough-in8/7/20198/7/20198/7/2019 9:39:01 AMAFAIL
Inspection was for the IBR only. Piping is only at 3'-4 1/2" bury depth. 4'-6" is required to top of pipe. Need bury wire and plans/small documents.

Inspection of In Building Riser. Mega Lug to be installed and rodded back to 90 elbow once underground is installed. Contact Rick Fouts Phone #: ###-#### Inspection requested via web by Matt Barnard
FIR19-00374 INSP-Sprinkler Rough-in8/6/20198/7/20198/7/2019 8:50:00 AMAPASS
Rough-in passed for the 1st and 3rd floor piping in the west most apartments. @nd floor piping was previously approved. A tenting inspection will be required prior to a 3rd floor piping cover. 1st and 2nd floors are ok for cover on the west most apartments. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-00763 FIRE-Final Inspection8/6/20198/7/20198/7/2019 7:51:17 AMAPASS
Life safety passed.

Shawn Phone #: ###-####