FIR19-00386
| INSP-Conference | 8/6/2019 | 8/7/2019 | 8/7/2019 1:13:13 PM | A | DONE |
|
|
Plans are in review status but I did note that several of the corridor sidewall heads appear to be blocked by adjacent walls and lockers.
George Jess is the contact. He would like this to take place before the hydro. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00568
| INSP-Sprinkler Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 1:03:41 PM | P | CANC |
|
|
Wrong permit scheduled.
|
FIR19-00374
| INSP-Sprinkler Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 12:59:40 PM | P | PASS |
|
|
Tenting is passed for the two west most 3rd floor apartments. Piping can be covered.
|
FIR19-00386
| INSP-Sprinkler Rough-in/Hydro | 8/6/2019 | 8/7/2019 | 8/7/2019 10:44:46 AM | A | PASS |
|
|
The overhead hydro for the wet system was witnessed with no pressure loss. No rough-in inspection performed due to plans being in review status. George Jess is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
NAF19-00019
| INSP-Sprinkler Rough-in/Hydro | 8/6/2019 | 8/7/2019 | 8/7/2019 9:56:06 AM | A | PASS |
|
|
24 hour air test on dry system and hydrostatic test on wet system witnessed with no pressure loss. Phone #: ###-#### Inspection requested via web by Sam Ball
|
NAF19-00026
| INSP-Sprinkler Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 9:54:42 AM | A | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered. Original entry made under NAF19-00019.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
NAF19-00027
| INSP-Sprinkler Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 9:54:13 AM | A | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered. Original entry made under NAF19-00019. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00531
| INSP-Sprinkler Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 9:39:01 AM | A | FAIL |
|
|
Inspection was for the IBR only. Piping is only at 3'-4 1/2" bury depth. 4'-6" is required to top of pipe. Need bury wire and plans/small documents.
Inspection of In Building Riser. Mega Lug to be installed and rodded back to 90 elbow once underground is installed. Contact Rick Fouts Phone #: ###-#### Inspection requested via web by Matt Barnard
|
FIR19-00374
| INSP-Sprinkler Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 8:50:00 AM | A | PASS |
|
|
Rough-in passed for the 1st and 3rd floor piping in the west most apartments. @nd floor piping was previously approved. A tenting inspection will be required prior to a 3rd floor piping cover. 1st and 2nd floors are ok for cover on the west most apartments. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-00763
| FIRE-Final Inspection | 8/6/2019 | 8/7/2019 | 8/7/2019 7:51:17 AM | A | PASS |
|
|
Life safety passed.
Shawn Phone #: ###-####
|