Inspections for the day of: Friday, September 16, 2011.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00366 INSP-Final Inspection9/16/20119/16/20119/16/2011 4:10:21 PMPCANC
over booked
FIR11-00285 INSP-Final Inspection9/16/20119/16/20119/16/2011 4:07:13 PMPPASS
permit finaled
FIR11-00475 INSP-Final Inspection9/15/20119/16/20119/16/2011 4:05:54 PMPCANC
over booked
BLD11-01981 FIRE-Final Inspection9/16/20119/16/20119/16/2011 4:04:42 PMPPASS
life safety passed
BLD11-01097 FIRE-Final Inspection9/14/20119/16/20119/16/2011 3:54:19 PMAFAIL
The project related fire alarm and fire sprinkler permits need addressed first. Also if all other life safety items are ok a temporary occupancy is ok, per the fire chief, if sprinkler plans have been submitted addressing the rack storage and the anti-freeze valves are locked open. I also noted the fire extinguishers require current inspection tags.
FIR11-00395 INSP-Sprinkler Rough-in9/16/20119/16/20119/16/2011 3:51:50 PMPFAIL
Remove the masking tape from the upright heads in the riser room. Replace the painted head over the facp. Resubmit plans addressing the rack storage which is not allowed per the existing scope of work.
FIR11-00454 INSP-Alarm Testing9/15/20119/16/20119/16/2011 3:50:30 PMAFAIL
See the city approved plans for a list of corrections. Signals to the monitoring station have been verified. EOL voltage has been verified.
FIR11-00363 INSP-Final Inspection9/16/20119/16/20119/16/2011 3:49:24 PMPPASS
permit finaled
FIR11-00477 INSP-Final Inspection9/15/20119/16/20119/16/2011 2:56:15 PMPCANC
Please contact Jeremy at ###-#### Phone #: ###-#### >> Inspection requested via web by David Dilley Inspection cancelled from web by: David Dilley
FIR11-00297 INSP-Final Inspection9/15/20119/16/20119/16/2011 12:06:51 PMACANC
Cancel per Gary
FIR11-00330 INSP-Final Inspection9/15/20119/16/20119/16/2011 12:04:22 PMAFAIL
Project is not ready for a final. Still need the fire alarm interconnections tested and the required 24 hour air test performed. Today we finished the rough-in for the remaining system and performed the forward flush which passed.
FIR11-00296 INSP-Final Inspection9/15/20119/16/20119/16/2011 10:52:04 AMAFAIL
Alarm, trouble and supervisory signals were tested through the AES but only a single address/building location is set up for the facility which includes multiple buildings and alarm systems. The monitoring company needs to receive specific addresses/locations for each of the reporting fire alarm panels.