BLD18-02858
| FIRE-Final Inspection | 9/18/2019 | 9/18/2019 | 9/19/2019 8:31:21 AM | P | PASS |
|
|
Life safety passed. Fire Station #6 verified that the opticon functioned. Curt Phone #: ###-####
|
BLD17-03395
| FIRE-Final Inspection | 9/18/2019 | 9/18/2019 | 9/19/2019 8:30:36 AM | P | PASS |
|
|
Life safety passed. Fire Station #6 verified that the opticon functioned. Curt Phone #: ###-####
|
BLD17-03396
| FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/19/2019 8:30:05 AM | A | PASS |
|
|
Life safety passed. Fire Station #6 verified that the opticon functioned. Curt Phone #: ###-####
|
BLD19-03309
| FIRE-Conference | 9/18/2019 | 9/18/2019 | 9/18/2019 2:32:38 PM | P | DONE |
|
|
Jim Ferguson and I spoke about the corrections needed as per my last inspection.
|
FIR19-00659
| INSP-Final Inspection | 9/12/2019 | 9/18/2019 | 9/18/2019 2:31:11 PM | P | PASS |
|
|
Permit finaled. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
FIR19-00689
| INSP-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 11:59:22 AM | P | CANC |
|
|
Cancel per Nate. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
FIR19-00700
| INSP-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 11:16:54 AM | A | CANC |
|
|
Cancel per contact. Contact is Nick Phone #: ###-#### Inspection requested via web by Chris Green
|
FIR19-00700
| INSP-Sprinkler Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 11:16:29 AM | A | CANC |
|
|
Cancel per contact. Contact is Nick Phone #: ###-#### Inspection requested via web by Chris Green
|
BLD19-00188
| FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 11:15:56 AM | A | PASS |
|
|
Life safety passed. No card to sign. Melvin Phone #: ###-####
|
FIR18-00957
| INSP-Sprinkler Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 10:05:59 AM | A | PART |
|
|
Piping in the building is ok for cover for the single head at the bottom of the stairs, second floor restroom and the Data room. I looked at the east side exterior canopy and the install looks good but the issue of galvanized piping came up and is currently being addressed with plan review. RUDY IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
FIR19-00655
| INSP-Sprinkler Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 9:53:55 AM | A | PASS |
|
|
Rough to cover for underground five foot out is passed and ok for cover. Contact is Robert. Phone #: ###-#### Inspection requested via web by Chris Green
|
BLD19-01812
| FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 9:00:35 AM | P | CANC |
|
|
>> Inspection requested via web by Scott Asin Inspection cancelled from web by: Scott Asin
|
BLD19-03429
| FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 8:42:05 AM | A | PASS |
|
|
Life safety passed. Previous item corrected. Allison Phone #: ###-####
|
FIR19-00309
| INSP-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 8:41:19 AM | A | PASS |
|
|
The FDC piping has been changed to galvanized. Permit finaled. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00383
| INSP-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 8:03:10 AM | A | PASS |
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|