GRD17-00025
| FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 2:18:28 PM | P | PASS |
|
|
Life safety passed
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
NAF18-00092
| INSP-Final | 9/4/2018 | 9/5/2018 | 9/5/2018 2:09:32 PM | P | FAIL |
|
|
No plans or small documents. No inspection was performed. I went over general requirements. Jim Page noted that the suppression system appears to be in-operative for the paint booth.
Call prior to going Phone #: 2084125969 >> Inspection requested via mobile web by John
|
BLD18-02507
| FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 2:08:11 PM | P | FAIL |
|
|
All items corrected except I still need the mechanical inspectors determination on whether a type 1 or type 2 hood is going to be required. The existing hood suppression system will need to be removed or modified depending on the mechanical inspectors decision.
Please call ahead for access - Whitney Phone #: ###-####
|
BLD18-02717
| FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 1:32:23 PM | P | PASS |
|
|
Life safety passed. Owner to provide single action hardware on the new doors "note 13" prior to a building inspection.
|
BLD18-02717
| FIRE-Final Inspection | 9/4/2018 | 9/5/2018 | 9/5/2018 1:30:01 PM | A | PASS |
|
|
Life safety passed. Owner to provide single action hardware on the new doors "note 13" prior to a building inspection.
call 15 mins ahead- Noah Phone #: ###-####
|
NAF17-00065
| INSP-Final | 9/4/2018 | 9/5/2018 | 9/5/2018 11:57:56 AM | A | FAIL |
|
|
No plans or small documents. I went over general life safety requirements.
Call prior to going Phone #: 2088660325 >> Inspection requested via mobile web by Brett
|
BLD18-03070
| FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 11:33:24 AM | P | FAIL |
|
|
Plans need to be resubmitted as a T.I. instead of an occupancy that include the maufacturing that is taking place. Information needed includes equipment/function and hazardous chemicals. Sprinklers are not spaced correctly for manufacturing.
Michelle Phone #: ###-####
|
FIR17-00603
| INSP-Sprinkler Rough-in/Hydro | 9/4/2018 | 9/5/2018 | 9/5/2018 10:34:41 AM | P | PASS |
|
|
See the city approved plans for locations mrked "ok" ehere piping is approved for cover. I noted a missing branchline restraint that will be checked at the next inspection. Also the dry sidewall has not been installed yet under the main exit canopy. The overhead hydro's passed with no visible loss at the guage.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-04218
| FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 9:17:08 AM | A | PASS |
|
|
Life safety passed.
Please call Justin 1/2-hour prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby
|
FIR18-00493
| INSP-Final Inspection | 9/4/2018 | 9/5/2018 | 9/5/2018 8:15:27 AM | A | FAIL |
|
|
Not ready for final due to missing ceiling tile but the rough-in passed. Piping can be covered.
Terry Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
BLD18-00353
| FIRE-Final Inspection | 9/4/2018 | 9/5/2018 | 9/5/2018 6:42:22 AM | A | PASS |
|
|
Life safety passed
Please call 30mins ahead of time so I can be there. Phone #: ###-#### Inspection requested via web by Gerome Fries
|