FIR19-00662
| INSP-Sprinkler Rough-in | 9/6/2019 | 9/6/2019 | 9/6/2019 2:12:46 PM | P | PART |
|
|
See the city approved plans for the underground supply piping that is ok for cover.
Jon Beazer is the contact. Please call ahead of time so someone can meet the inspector out there. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00325
| INSP-Sprinkler Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 1:55:06 PM | P | PART |
|
|
Only the individual rooms are ok for cover. The corridors can not be covered due to overspaced pendant heads.
Approved Plans are onsite with the contractor. Please call Paul Vaughn before heading to job site at Phone #: ###-#### Inspection requested via web by Matt Barnard
|
FIR18-00789
| INSP-Final Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 12:21:18 PM | P | CANC |
|
|
Final on shell and pump run with capital pump. Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
FIR19-00619
| INSP-Final Inspection | 9/3/2019 | 9/6/2019 | 9/6/2019 11:38:56 AM | A | FAIL |
|
|
Need the existing insulation secured back to the deck, need ceiling tile and T bar installed. I also noted that two heads outside of the scope of work are not the min. 6' apart. This will need to be addressed prior to a final building sign off. Kyle Koepnick is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00612
| INSP-Final Inspection | 9/3/2019 | 9/6/2019 | 9/6/2019 10:48:53 AM | A | PASS |
|
|
Permit finaled. Later morning if possible. Please call Damien ###-#### to coordinate. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
NAF19-00065
| INSP-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 10:45:01 AM | A | FAIL |
|
|
Two pendant heads are blocked in the southeast lower ceiling/room by surface mounted lights. One pendant in the high is still covered with tape. All other items appear okThank you have a nice day Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR19-00251
| INSP-Supply line flush | 9/5/2019 | 9/6/2019 | 9/6/2019 9:35:25 AM | A | PASS |
|
|
Underground flush witnessed. 2,100 gallons of water flow verified with pitot guage.
Todd Ketterling is the contact. He would like this in the late AM. I''ve talked to Stacey with Suez and he is aware of this inspection. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-03279
| FIRE-Final Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 8:09:33 AM | A | FAIL |
|
|
Provide street cacing address as discussed, remove thumbturn deadbolt at main exit (keyed ok), repair the exit sign at the main exit.
call for access- Charlie Phone #: ###-####
|
FIR19-00325
| INSP-Final Inspection | 9/5/2019 | 9/6/2019 | 9/5/2019 4:08:49 PM | P | CANC |
|
|
Approved Plans are onsite with the Contractor. Please Contact Paul Vaughn Before Heading to Job Site at Phone #: ###-#### >> Inspection requested via web by Matt Barnard Inspection cancelled from web by: Matt Barnard Inspection cancelled from web by: Matt Barnard
|