FIR19-00662
| INSP-Sprinkler Rough-in | 9/6/2019 | 9/9/2019 | 9/9/2019 1:17:52 PM | P | FAIL |
|
|
Apparently due to the weather the holes that had been left open for inspection have filled with mud/dirt. The supply piping is not visible. Piping needs to be uncovered and an inspection re-scheduled. Jon Beazer is the contact for the underground RTC. He is hoping for an PM appointment. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00251
| INSP-Sprinkler Rough-in/Hydro | 9/6/2019 | 9/9/2019 | 9/9/2019 11:16:07 AM | A | PASS |
|
|
The underground hydro test was witnessed. Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00374
| INSP-Sprinkler Rough-in | 9/9/2019 | 9/9/2019 | 9/9/2019 9:53:17 AM | P | PASS |
|
|
Tenting inspection passed for the top two apartments at the very east end of the building.
|
NAF19-00065
| INSP-Final | 9/6/2019 | 9/9/2019 | 9/9/2019 9:29:43 AM | A | DONE |
|
|
Permit finaled
Thank you Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR19-00478
| INSP-Sprinkler Rough-in | 9/6/2019 | 9/9/2019 | 9/9/2019 9:27:04 AM | A | FAIL |
|
|
Corrections have been made except for the minimum destance from the sidewall deflector to the ceiling. Contact: Steven Vaughn Phone #: ###-#### Inspection requested via web by Hunter Fillmore
|